Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects

Purpose Building-integrated photovoltaic projects (BIPVPs) integrate BIPV technology into buildings, advancing them into green buildings while bringing new risk challenges. These risks are highly uncertain and intricately interconnected. This research aims to examine the dynamic characteristics of BIPVP risks from a network perspective and propose strategies to guide more effective risk management. Design/methodology/approach Risk factors are identified through a literature review and interviews, then categorized by life cycle and stakeholders. Subsequently, focus group discussions evaluate risk interactions, and social network analysis (SNA) is applied to visualize and calculate the risk network. Finally, expert interviews are organized to propose strategies for challenges. Findings This research revealed the high-density characteristics of the risk network in BIPVPs, indicating strong interconnections among risks. Risks in the feasibility study and construction stages were the most prominent, with developers, manufacturers and contractors occupying central roles in risk propagation. Network analysis identified eight major challenges throughout the life cycle of BIPVPs: missing policies, low acceptance, uncertain costs, weak design, material shortages, poor coordination, module failure and difficult recovery. These challenges reflected the combined influence of technological, economic, policy and managerial factors. Originality/value This research connects risks with stakeholders, enhancing risk management knowledge for BIPVPs. The risk list and response strategies offer practical guidance for project participants in managing risks effectively.

Authors

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-05-06
DOI
https://doi.org/10.1108/ecam-10-2024-1452
Citations
2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
4.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects

Man Pun Wan, Xianfei Yin, Mengqi Yuan, Long Li
2 citations
Engineering Construction & Architectural Management
Construction Project Management and Performance
4.21
article

Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects

Man Pun Wan, Xianfei Yin, Mengqi Yuan, Long Li
article en
2 citations

Abstract

Purpose Building-integrated photovoltaic projects (BIPVPs) integrate BIPV technology into buildings, advancing them into green buildings while bringing new risk challenges. These risks are highly uncertain and intricately interconnected. This research aims to examine the dynamic characteristics of BIPVP risks from a network perspective and propose strategies to guide more effective risk management. Design/methodology/approach Risk factors are identified through a literature review and interviews, then categorized by life cycle and stakeholders. Subsequently, focus group discussions evaluate risk interactions, and social network analysis (SNA) is applied to visualize and calculate the risk network. Finally, expert interviews are organized to propose strategies for challenges. Findings This research revealed the high-density characteristics of the risk network in BIPVPs, indicating strong interconnections among risks. Risks in the feasibility study and construction stages were the most prominent, with developers, manufacturers and contractors occupying central roles in risk propagation. Network analysis identified eight major challenges throughout the life cycle of BIPVPs: missing policies, low acceptance, uncertain costs, weak design, material shortages, poor coordination, module failure and difficult recovery. These challenges reflected the combined influence of technological, economic, policy and managerial factors. Originality/value This research connects risks with stakeholders, enhancing risk management knowledge for BIPVPs. The risk list and response strategies offer practical guidance for project participants in managing risks effectively.

Engineering Construction & Architectural Management
Openalex Percentile: Top 7%
Construction Project Management and Performance
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects — Man Pun Wan, Xianfei Yin, et al. · Engineering Construction & Architectural Management (2025) | TGRS Research Map | TGRS