Critical Path Method Vs EVM: A Comparative Analysis

Performing well in construction project management rests on excellent scheduling and performance tracking. Of the project control tools used, the Critical Path Method (CPM) and Earned Value Management (EVM) provide stand-alone perspectives, but they are also related. EVM facilitates the integration of cost and schedule performance, while CPM emphasizes task sequencing and time management. As Primavera P6 continues to gain adoption amongst organizations, the synergy and distillation between these project management methodologies is becoming more marked. Based on this, this paper compares the two of them from the perspectives of construction management. It investigates the applications, limitations, and impacts on CPM and EVM project outcomes. This informs the project managers of the strategic benefits of combining these methods for better control and forecasting.

Authors

Publication Details

Journal
Journal of Advances in Developmental Research
Published
2025-04-09
DOI
https://doi.org/10.71097/ijaidr.v16.i1.1409
Primary Topic
Non-Destructive Testing Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Critical Path Method Vs EVM: A Comparative Analysis

Deepika Dayalan -
Journal of Advances in Developmental Research
Non-Destructive Testing Techniques
article

Critical Path Method Vs EVM: A Comparative Analysis

Deepika Dayalan -
article en

Abstract

Performing well in construction project management rests on excellent scheduling and performance tracking. Of the project control tools used, the Critical Path Method (CPM) and Earned Value Management (EVM) provide stand-alone perspectives, but they are also related. EVM facilitates the integration of cost and schedule performance, while CPM emphasizes task sequencing and time management. As Primavera P6 continues to gain adoption amongst organizations, the synergy and distillation between these project management methodologies is becoming more marked. Based on this, this paper compares the two of them from the perspectives of construction management. It investigates the applications, limitations, and impacts on CPM and EVM project outcomes. This informs the project managers of the strategic benefits of combining these methods for better control and forecasting.

Journal of Advances in Developmental ResearchVol. 16(1)
Openalex Percentile: Top 91%
Non-Destructive Testing Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.