The Problem of Defensive Construction Organization on the Line of Chinese Eastern Railway Before and in Time of World War I

The article, based on the materials of the Russian State Military Historical Archive, which are being published for the first time, examines the problem of organization of the permanent defensive construction on the line of China Eastern Railway. The fundamental decision to start the construction was made at the meetings of the Council of Ministers on April 25 and December 12, 1913 and February 13, 1914, when it was decided to construct specifically permanent defensive construction. The paper shows that despite the order to start the work in the 1914 construction season, it was not possible to do so. It is noted that the main causes were serious difficulties in organizing work in China, because all military construction documentation of the Russian Empire was designed to carry out work either inside the country or in the area of the Acting Army. It has been found that the outbreak of the World War I significantly complicated the situation, as it led to an overload of almost all civil and military authorities involved in the process. The article identifies the causes for the breaking of the 1914 construction season. It is shown that as a result of the outbreak of War and the work on mobilization, the Administration of CER constantly delayed the provision of information necessary for the organization of construction work. The greatest difficulties arose with the approval of prices high limits for building materials in the Military Council of War Ministry in Petrograd, which worked too slowly. The command of the Irkutsk Military District had no real opportunities to speed up the process of approving, and approving the necessary documents. As a result, it was possible to begin the direct construction of defensive structures not earlier than in the construction season of 1915.

Authors

Institutions

Publication Details

Journal
Herald of Omsk University Series Historical Studies
Published
2025-03-28
DOI
https://doi.org/10.24147/2312-1300.2025.12(1).19-25
Citations
1
Primary Topic
Urban Design and Spatial Analysis
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Problem of Defensive Construction Organization on the Line of Chinese Eastern Railway Before and in Time of World War I

Roman S. Avilov
1 citations
Herald of Omsk University Series Historical Studies
Urban Design and Spatial Analysis
1.01
article

The Problem of Defensive Construction Organization on the Line of Chinese Eastern Railway Before and in Time of World War I

Roman S. Avilov
article en
1 citations

Abstract

The article, based on the materials of the Russian State Military Historical Archive, which are being published for the first time, examines the problem of organization of the permanent defensive construction on the line of China Eastern Railway. The fundamental decision to start the construction was made at the meetings of the Council of Ministers on April 25 and December 12, 1913 and February 13, 1914, when it was decided to construct specifically permanent defensive construction. The paper shows that despite the order to start the work in the 1914 construction season, it was not possible to do so. It is noted that the main causes were serious difficulties in organizing work in China, because all military construction documentation of the Russian Empire was designed to carry out work either inside the country or in the area of the Acting Army. It has been found that the outbreak of the World War I significantly complicated the situation, as it led to an overload of almost all civil and military authorities involved in the process. The article identifies the causes for the breaking of the 1914 construction season. It is shown that as a result of the outbreak of War and the work on mobilization, the Administration of CER constantly delayed the provision of information necessary for the organization of construction work. The greatest difficulties arose with the approval of prices high limits for building materials in the Military Council of War Ministry in Petrograd, which worked too slowly. The command of the Irkutsk Military District had no real opportunities to speed up the process of approving, and approving the necessary documents. As a result, it was possible to begin the direct construction of defensive structures not earlier than in the construction season of 1915.

Herald of Omsk University Series Historical Studies
Institute of History, Archaeology and Ethnography of the Peoples of Far-East (RU)
Openalex Percentile: Top 25%
Urban Design and Spatial Analysis
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Problem of Defensive Construction Organization on the Line of Chinese Eastern Railway Before and in Time of World War I — Roman S. Avilov · Herald of Omsk University Series Historical Studies (2025) | TGRS Research Map | TGRS