Investigating the state of fire protection systems at Chris Hani Baragwanath Academic Hospital (2022–2023)

Abstract Chris Hani Baragwanath Academic Hospital (CHBAH) is known as ‘Bara’ and is the largest public hospital in Africa and the third largest in the world, with approximately 3,200 beds. It has 407 buildings and operates on a 24-h basis. Hospitals have experienced hazardous fires, which can result in loss of life, pollution, and property damage. The purpose of this study was to investigate the current fire protection systems at CHBAH to determine whether they can protect the hospital community during fire outbreaks. The research questions for the study are as follows: 1. What is the current state of the hospital regarding fire protection systems? 2. What is the current international practice of safety at hospitals? 3. What is the best practice regarding the maintenance of the fire protection system at hospitals? 4. What are the perceptions of hospital staff about hospital fire protection systems? This study used a mixed-methods research approach with cross-sectional analysis. The population consisted of the hospital community, which included top management, specialists, doctors, nurses, administration staff, and general workers. The sample comprised 280 respondents, 130 observed buildings, and six interviews from top management at CHBAH. Methods used to collect data: questionnaires, in-depth interviews, and observations. The results from questionnaires, observations, and interviews indicated that the maintenance and functionality of fire protection systems at CHBAH were compromised, related to hospital fire safety and compliance with South African National Standard Codes, the City of Johannesburg Bylaws, and other relevant codes to the hospital.

Authors

Institutions

Publication Details

Journal
Architecture Structures and Construction
Published
2025-05-05
DOI
https://doi.org/10.1007/s44150-025-00153-3
Primary Topic
Fire dynamics and safety research
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investigating the state of fire protection systems at Chris Hani Baragwanath Academic Hospital (2022–2023)

Botshelo Brenda Mokaleng, Mamagase Daniel Macdonald Makuse, Mr Nthai Freddy Monnye
Architecture Structures and Construction
Fire dynamics and safety research
article

Investigating the state of fire protection systems at Chris Hani Baragwanath Academic Hospital (2022–2023)

Botshelo Brenda Mokaleng, Mamagase Daniel Macdonald Makuse, Mr Nthai Freddy Monnye
article en

Abstract

Abstract Chris Hani Baragwanath Academic Hospital (CHBAH) is known as ‘Bara’ and is the largest public hospital in Africa and the third largest in the world, with approximately 3,200 beds. It has 407 buildings and operates on a 24-h basis. Hospitals have experienced hazardous fires, which can result in loss of life, pollution, and property damage. The purpose of this study was to investigate the current fire protection systems at CHBAH to determine whether they can protect the hospital community during fire outbreaks. The research questions for the study are as follows: 1. What is the current state of the hospital regarding fire protection systems? 2. What is the current international practice of safety at hospitals? 3. What is the best practice regarding the maintenance of the fire protection system at hospitals? 4. What are the perceptions of hospital staff about hospital fire protection systems? This study used a mixed-methods research approach with cross-sectional analysis. The population consisted of the hospital community, which included top management, specialists, doctors, nurses, administration staff, and general workers. The sample comprised 280 respondents, 130 observed buildings, and six interviews from top management at CHBAH. Methods used to collect data: questionnaires, in-depth interviews, and observations. The results from questionnaires, observations, and interviews indicated that the maintenance and functionality of fire protection systems at CHBAH were compromised, related to hospital fire safety and compliance with South African National Standard Codes, the City of Johannesburg Bylaws, and other relevant codes to the hospital.

Architecture Structures and ConstructionVol. 5(1)
Tshwane University of Technology (ZA)
Tshwane University of Technology
Openalex Percentile: Top 89%
Fire dynamics and safety research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.