An analysis of the optimal research and development investment level of contractor using the panel threshold regression model

This study explores the threshold effect between R&D investment and firm performance in the construction industry, focusing on optimizing R&D spending in this capital-intensive sector. Unlike industries with shorter innovation cycles, construction requires long project durations, high costs, and regulatory compliance, making strategic R&D allocation essential. Using the panel threshold regression model (PTRM), the study analyses data from 136 Korean construction firms with over 100 employees and in-house R&D centres. Threshold values of 0.47% for R&D project cost and 2.25% for researcher ratio are identified, beyond which investment efficiency declines. PTRM is suitable for detecting nonlinear effects, though future studies should test alternative models for greater reliability. While firm-specific financial factors are controlled, external influences such as market dynamics and government policies are not considered. A five-year lag is assumed between R&D investment and outcomes, aligning with South Korea's planning norms, but alternative lags are recommended for further study. The findings offer practical insights for SMEs in managing R&D and financial constraints, with relevance extending beyond Korea to developing nations seeking to close technological gaps. Future research should refine sector-specific benchmarks and consider firm size variations for more applicable R&D strategies.

Authors

Institutions

Publication Details

Journal
International Journal of Construction Management
Published
2025-05-05
DOI
https://doi.org/10.1080/15623599.2025.2496952
Primary Topic
Innovation Policy and R&D
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An analysis of the optimal research and development investment level of contractor using the panel threshold regression model

Seoung-Wook Whang, Ki Pyung Kim, Roger Flanagan
International Journal of Construction Management
Innovation Policy and R&D
article

An analysis of the optimal research and development investment level of contractor using the panel threshold regression model

Seoung-Wook Whang, Ki Pyung Kim, Roger Flanagan
article en

Abstract

This study explores the threshold effect between R&D investment and firm performance in the construction industry, focusing on optimizing R&D spending in this capital-intensive sector. Unlike industries with shorter innovation cycles, construction requires long project durations, high costs, and regulatory compliance, making strategic R&D allocation essential. Using the panel threshold regression model (PTRM), the study analyses data from 136 Korean construction firms with over 100 employees and in-house R&D centres. Threshold values of 0.47% for R&D project cost and 2.25% for researcher ratio are identified, beyond which investment efficiency declines. PTRM is suitable for detecting nonlinear effects, though future studies should test alternative models for greater reliability. While firm-specific financial factors are controlled, external influences such as market dynamics and government policies are not considered. A five-year lag is assumed between R&D investment and outcomes, aligning with South Korea's planning norms, but alternative lags are recommended for further study. The findings offer practical insights for SMEs in managing R&D and financial constraints, with relevance extending beyond Korea to developing nations seeking to close technological gaps. Future research should refine sector-specific benchmarks and consider firm size variations for more applicable R&D strategies.

International Journal of Construction ManagementVol. 25(16)
University of East London (GB), University of South Australia (AU), University of Reading (GB)
Partnerships for the goals
Openalex Percentile: Top 86%
Innovation Policy and R&D
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An analysis of the optimal research and development investment level of contractor using the panel threshold regression model — Seoung-Wook Whang, Ki Pyung Kim, et al. · International Journal of Construction Management (2025) | TGRS Research Map | TGRS