Dow plans deep cuts amid poor economy

Responding to economic uncertainty and a longer and deeper chemical industry downturn than it had anticipated, Dow is planning further cuts to manufacturing. The company, the largest US chemical maker, is delaying an ethylene project in Alberta and may idle or permanently shut down three large facilities in Europe, including its ethylene cracker in Böhlen, Germany. “The reality is our industry is in one of the most protracted downcycles in decades, facing a third consecutive year of below 3% GDP growth,” CEO Jim Fitterling said in an April 24 conference call with analysts. “This has been further exacerbated by geopolitical and macroeconomic concerns, which are weighing on demand globally.” Dow is delaying its so-called Path2Zero project in Fort Saskatchewan, Alberta. The $6.5 billion project includes the construction of new ethylene and polyethylene plants. Instead of using fossil fuels to heat the furnaces, the company plans to use hydrogen produced by

Authors

Publication Details

Journal
C&EN Global Enterprise
Published
2025-05-05
DOI
https://doi.org/10.1021/cen-10312-buscon3
Primary Topic
Global Health Care Issues
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Dow plans deep cuts amid poor economy

Alex Tullo
C&EN Global Enterprise
Global Health Care Issues
article

Dow plans deep cuts amid poor economy

Alex Tullo
article en

Abstract

Responding to economic uncertainty and a longer and deeper chemical industry downturn than it had anticipated, Dow is planning further cuts to manufacturing. The company, the largest US chemical maker, is delaying an ethylene project in Alberta and may idle or permanently shut down three large facilities in Europe, including its ethylene cracker in Böhlen, Germany. “The reality is our industry is in one of the most protracted downcycles in decades, facing a third consecutive year of below 3% GDP growth,” CEO Jim Fitterling said in an April 24 conference call with analysts. “This has been further exacerbated by geopolitical and macroeconomic concerns, which are weighing on demand globally.” Dow is delaying its so-called Path2Zero project in Fort Saskatchewan, Alberta. The $6.5 billion project includes the construction of new ethylene and polyethylene plants. Instead of using fossil fuels to heat the furnaces, the company plans to use hydrogen produced by

C&EN Global EnterpriseVol. 103(12)
No poverty
Openalex Percentile: Top 84%
Global Health Care Issues
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.