Techno-Economic Comparison of a Large-Scale Nuclear Power Plant, Small Modular Reactors, and Wind and Solar Power Plant Deployment

A comparison of the net present value, the payback period, and the levelized cost of electricity for three different projects of construction and exploitation of plants for electricity production with the aim of decarbonizing the energy sector is conducted. The first project is the building of a large-scale nuclear power plant with a light-water reactor, the second one is the deployment of several identical small modular reactors, and the third project is based on solar and wind power plants. Given that the sun and wind are intermittent renewable energy sources, it is inevitable to take into account the construction of an energy storage facility in the last project. The results show that the most profitable are the small modular reactors, while the investment into solar and wind power plants is burdened with the necessary electricity storage plant costs. Another drawback of an investment in solar and wind power plants is their shorter exploitation lifetime of 25 years compared to the long-term operation of nuclear power plants of 60 years or even more.

Authors

Institutions

Publication Details

Journal
Energies
Published
2025-05-05
DOI
https://doi.org/10.3390/en18092355
Citations
2
Primary Topic
Hybrid Renewable Energy Systems
Type
article
Field-Weighted Citation Impact
1.06

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Techno-Economic Comparison of a Large-Scale Nuclear Power Plant, Small Modular Reactors, and Wind and Solar Power Plant Deployment

Jovica Riznic, Milan M. Petrović, Vladimir D. Stevanović, Sanja Milivojevic et al.
2 citations
Energies
Hybrid Renewable Energy Systems
1.06
article

Techno-Economic Comparison of a Large-Scale Nuclear Power Plant, Small Modular Reactors, and Wind and Solar Power Plant Deployment

Jovica Riznic, Milan M. Petrović, Vladimir D. Stevanović, Sanja Milivojevic, Milos Lazarevic
article en
2 citations

Abstract

A comparison of the net present value, the payback period, and the levelized cost of electricity for three different projects of construction and exploitation of plants for electricity production with the aim of decarbonizing the energy sector is conducted. The first project is the building of a large-scale nuclear power plant with a light-water reactor, the second one is the deployment of several identical small modular reactors, and the third project is based on solar and wind power plants. Given that the sun and wind are intermittent renewable energy sources, it is inevitable to take into account the construction of an energy storage facility in the last project. The results show that the most profitable are the small modular reactors, while the investment into solar and wind power plants is burdened with the necessary electricity storage plant costs. Another drawback of an investment in solar and wind power plants is their shorter exploitation lifetime of 25 years compared to the long-term operation of nuclear power plants of 60 years or even more.

EnergiesVol. 18(9)
Ontario Tech University (CA), University of Belgrade (RS)
Science Fund of the Republic of Serbia
Affordable and clean energy
Openalex Percentile: Top 21%
Hybrid Renewable Energy Systems
1.06
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Techno-Economic Comparison of a Large-Scale Nuclear Power Plant, Small Modular Reactors, and Wind and Solar Power Plant Deployment — Jovica Riznic, Milan M. Petrović, et al. · Energies (2025) | TGRS Research Map | TGRS