ANALISA PENGUJIAN <i>PARTIAL DISCHARGE</i> PADA KUBIKEL TD #1 MENGGUNAKAN METODE <i>TRANSIENT EARTH VOLTAGE </i>DI GARDU INDUK MUARA BUNGO

Muara Bungo Main Substation is one of the main substations in the working area of ​​PT. PLN (Persero) UPT Jambi. This substation is located along the Sungai Binjai, Batin III District, Bungo Regency, Jambi Province. The Power Transformer 1 cubicle panel at this substation often experiences problems with insulation defects which can cause interference with electricity transmission. In this research, the transient earth voltage method is applied, which functions as a sensor to detect partial discharge signals in high voltage equipment. The sensor used to measure transient ground voltage is a capacitive sensor. This testing can be done directly (online) without disrupting operations. The measuring instrument used in partial discharge testing is the Ultra TEV Plus 2.The results of partial discharge testing using the transient earth voltage method show that most of the panels and their components, especially panel TD No. 1, in good condition. However, there is one component, namely the circuit breaker (PMT), which shows the highest partial discharge value. Tests on Palem feeder cubicles showed the highest TEV value of 12 dB and PPC of 4.62 for the PMT component. Overall, the measured TEV values ​​ranged from 10 to 19 dB, and the PPC ranged from 0.5 to 6, indicating that the Palem feeder cubicles were classified as low-level PD. Based on these results, every PMT component in the field needs to be checked thoroughly and repairs planned if there are problems with the PMT material. Keywords: Circuit Breaker (PMT), Muara Bungo Substation, Partial Discharge, TEV Sensor, Ultra TEV Plus 2 ABSTRAK Gardu Induk Muara Bungo adalah salah satu gardu induk dari wilayah kerja PT. PLN (Persero) UPT Jambi. Gardu ini berada di sepanjang Sungai Binjai, Kecamatan Batin III, Kabupaten Bungo, Provinsi Jambi. Panel kubikel Trafo Daya 1 di gardu ini sering mengalami masalah cacat isolasi yang bisa menyebabkan gangguan pada transmisi listrik. Dalam penelitian ini diterapkan metode transient earth voltage, yang berfungsi sebagai sensor untuk mendeteksi sinyal pelepasan sebagian pada peralatan tegangan tinggi. Sensor yang digunakan untuk mengukur tegangan tanah transien adalah sensor kapasitif. Pengujian ini dapat dilakukan secara langsung (online) tanpa mengganggu operasional. Alat ukur yang dipakai dalam pengujian pelepasan sebagian adalah Ultra TEV Plus 2. Hasil pengujian pelepasan sebagian dengan metode transient earth voltage menunjukkan bahwa sebagian besar panel dan komponennya, khususnya panel TD No. 1, dalam kondisi baik. Namun, terdapat satu komponen, yaitu pemutus arus (PMT), yang menunjukkan nilai pelepasan sebagian paling tinggi. Pengujian pada kubikel penyulang Palem menunjukkan nilai TEV tertinggi sebesar 12 dB dan PPC sebesar 4,62 untuk komponen PMT. Secara keseluruhan, nilai TEV yang terukur berkisar antara 10 hingga 19 dB, dan PPC antara 0,5 hingga 6, menandakan bahwa kubikel penyulang Palem tergolong dalam kategori PD tingkat rendah. Berdasarkan hasil ini, setiap komponen PMT di lapangan perlu diperiksa secara menyeluruh dan direncanakan perbaikannya jika terdapat masalah pada material PMT.

Authors

Institutions

Publication Details

Journal
eLEKTRIKA
Published
2025-05-03
DOI
https://doi.org/10.26623/elektrika.v17i1.10382
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISA PENGUJIAN PARTIAL DISCHARGE PADA KUBIKEL TD #1 MENGGUNAKAN METODE TRANSIENT EARTH VOLTAGE DI GARDU INDUK MUARA BUNGO

Vella Savira
eLEKTRIKA
Geotechnical and construction materials studies
article

ANALISA PENGUJIAN PARTIAL DISCHARGE PADA KUBIKEL TD #1 MENGGUNAKAN METODE TRANSIENT EARTH VOLTAGE DI GARDU INDUK MUARA BUNGO

Vella Savira
article en

Abstract

Muara Bungo Main Substation is one of the main substations in the working area of ​​PT. PLN (Persero) UPT Jambi. This substation is located along the Sungai Binjai, Batin III District, Bungo Regency, Jambi Province. The Power Transformer 1 cubicle panel at this substation often experiences problems with insulation defects which can cause interference with electricity transmission. In this research, the transient earth voltage method is applied, which functions as a sensor to detect partial discharge signals in high voltage equipment. The sensor used to measure transient ground voltage is a capacitive sensor. This testing can be done directly (online) without disrupting operations. The measuring instrument used in partial discharge testing is the Ultra TEV Plus 2.The results of partial discharge testing using the transient earth voltage method show that most of the panels and their components, especially panel TD No. 1, in good condition. However, there is one component, namely the circuit breaker (PMT), which shows the highest partial discharge value. Tests on Palem feeder cubicles showed the highest TEV value of 12 dB and PPC of 4.62 for the PMT component. Overall, the measured TEV values ​​ranged from 10 to 19 dB, and the PPC ranged from 0.5 to 6, indicating that the Palem feeder cubicles were classified as low-level PD. Based on these results, every PMT component in the field needs to be checked thoroughly and repairs planned if there are problems with the PMT material. Keywords: Circuit Breaker (PMT), Muara Bungo Substation, Partial Discharge, TEV Sensor, Ultra TEV Plus 2 ABSTRAK Gardu Induk Muara Bungo adalah salah satu gardu induk dari wilayah kerja PT. PLN (Persero) UPT Jambi. Gardu ini berada di sepanjang Sungai Binjai, Kecamatan Batin III, Kabupaten Bungo, Provinsi Jambi. Panel kubikel Trafo Daya 1 di gardu ini sering mengalami masalah cacat isolasi yang bisa menyebabkan gangguan pada transmisi listrik. Dalam penelitian ini diterapkan metode transient earth voltage, yang berfungsi sebagai sensor untuk mendeteksi sinyal pelepasan sebagian pada peralatan tegangan tinggi. Sensor yang digunakan untuk mengukur tegangan tanah transien adalah sensor kapasitif. Pengujian ini dapat dilakukan secara langsung (online) tanpa mengganggu operasional. Alat ukur yang dipakai dalam pengujian pelepasan sebagian adalah Ultra TEV Plus 2. Hasil pengujian pelepasan sebagian dengan metode transient earth voltage menunjukkan bahwa sebagian besar panel dan komponennya, khususnya panel TD No. 1, dalam kondisi baik. Namun, terdapat satu komponen, yaitu pemutus arus (PMT), yang menunjukkan nilai pelepasan sebagian paling tinggi. Pengujian pada kubikel penyulang Palem menunjukkan nilai TEV tertinggi sebesar 12 dB dan PPC sebesar 4,62 untuk komponen PMT. Secara keseluruhan, nilai TEV yang terukur berkisar antara 10 hingga 19 dB, dan PPC antara 0,5 hingga 6, menandakan bahwa kubikel penyulang Palem tergolong dalam kategori PD tingkat rendah. Berdasarkan hasil ini, setiap komponen PMT di lapangan perlu diperiksa secara menyeluruh dan direncanakan perbaikannya jika terdapat masalah pada material PMT.

eLEKTRIKAVol. 17(1)
Sultan Agung Islamic University (ID)
Openalex Percentile: Top 90%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.