River Basin Management implementation: a commentary on a plan for change

A number of European Union countries, including Ireland, have faced referrals to the Court of Justice for delays in reviewing, adopting, and implementing River Basin Management Plans (RBMPs) as required by the Water Framework Directive (Directive 2000/60/EC). These delays undermine the effective execution of measures necessary to achieve WFD water quality objectives, compromising environmental sustainability and eroding public trust. This commentary examines how such delays hinder implementation, resulting in inconsistent improvements in water quality across monitored bodies. Drawing on draft submissions of the 3rd RBMP (2022–2027), key challenges are identified, and a transformative plan for change is proposed. This approach emphasises timely planning and implementation of measures, active public participation, robust monitoring, and the integration of sustainable agricultural practices to reduce environmental pressures and protect the ecological health of water resources.

Authors

Institutions

Publication Details

Journal
Environmental Sciences Europe
Published
2025-03-06
DOI
https://doi.org/10.1186/s12302-025-01077-x
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

River Basin Management implementation: a commentary on a plan for change

Sarpong Hammond Antwi
Environmental Sciences Europe
Water resources management and optimization
article

River Basin Management implementation: a commentary on a plan for change

Sarpong Hammond Antwi
article en

Abstract

A number of European Union countries, including Ireland, have faced referrals to the Court of Justice for delays in reviewing, adopting, and implementing River Basin Management Plans (RBMPs) as required by the Water Framework Directive (Directive 2000/60/EC). These delays undermine the effective execution of measures necessary to achieve WFD water quality objectives, compromising environmental sustainability and eroding public trust. This commentary examines how such delays hinder implementation, resulting in inconsistent improvements in water quality across monitored bodies. Drawing on draft submissions of the 3rd RBMP (2022–2027), key challenges are identified, and a transformative plan for change is proposed. This approach emphasises timely planning and implementation of measures, active public participation, robust monitoring, and the integration of sustainable agricultural practices to reduce environmental pressures and protect the ecological health of water resources.

Environmental Sciences EuropeVol. 37(1)
Dundalk Institute of Technology (IE)
Climate action
Openalex Percentile: Top 88%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.