Automatic Generation Method for Crew Scheduling After a Large-scale Natural Disaster
When railway line sections are partially disrupted due to damage from large-scale natural disasters, it is necessary to prepare crew schedule plans for temporary timetables. In such a case, a crew schedule plan ensures that duties once assigned to crew members are not changed. As this task is time-consuming for schedule planners, an automatic crew scheduling method for supporting planners is desired. In this paper, we focus on crew scheduling following a large-scale natural disaster. The proposed algorithm is based on mathematical programming and column generation. In addition, we show the results of computational experiments based on a real disaster case, which indicate that the proposed algorithm can generate an efficient schedule plan in a short time.
Authors
- Satoshi Kato (ORCID: https://orcid.org/0000-0001-7947-9664)
- Jun Imaizumi (ORCID: https://orcid.org/0000-0002-7093-5739)
- Taichi Nakahigashi
Institutions
- Railway Technical Research Institute (JP)
- Toyo University (JP)
Publication Details
- Journal
- IEEJ Transactions on Industry Applications
- Published
- 2025-05-01
- DOI
- https://doi.org/10.1541/ieejias.145.343
- Primary Topic
- Scheduling and Timetabling Solutions
- Type
- article
- Field-Weighted Citation Impact
- 0.00