Failure Law of Soft and Hard Interlayer Overlying Rock in Gently Inclined, Super‐Thick Coal Seam and Research on the Development Height of a Water‐Conducting Fissure Zone

ABSTRACT This study examines the failure laws of soft and hard interlayer overlying rocks and the development height of the water‐conducting fracture zone in a gently inclined super‐thick coal seam at the Qifeng coal mine, Shanxi. The overlying rocks above the working face were classified into four typical structural types: soft‐hard‐soft‐hard, hard‐soft‐hard‐soft, soft‐soft‐hard‐hard, and hard‐hard‐soft‐soft. First, the failure laws of these four types of overlying rock structures were studied theoretically. Theoretical analysis revealed that different overlying rock structures form different composite rock beams that move synchronously after coal excavation. Numerical simulation using FLAC 3D showed that the overburden failure does not change linearly but forms different combined rock beams according to the different overburden structures, resulting in a step change. The soft–soft–hard–hard overburden structure exhibits the largest damage extent, while the soft–hard–soft–hard overburden structure results in the highest damage height. When the hard rock above the coal seam is closer to the stope, the influence of the mining stress is greater, leading to stress concentration at the junction of soft and hard rocks. Three methods—theoretical analysis, numerical simulation, and field measurement—were used to study the overlying rock failure law and the development height of the water‐conducting fracture zone of the 51408 working face of the Qifeng Coal industry. The results show that the guiding height of the 51408 working face of the Qifeng Coal industry is 120.12, 103.6, 113.2, and 116.1 m for the four overlying rock structures. The maximum measured height of 116.1 m was considered the development height of the water‐conducting fracture zone. The field‐measured results are consistent with those obtained by theoretical calculation and numerical simulation, confirming the accuracy of the theoretical analysis and numerical simulation and providing a basis for water prevention and control of the roof of gently tilting super‐thick coal seams.

Authors

Institutions

Publication Details

Journal
Energy Science & Engineering
Published
2025-04-29
DOI
https://doi.org/10.1002/ese3.70121
Citations
4
Primary Topic
Geomechanics and Mining Engineering
Type
article
Field-Weighted Citation Impact
3.45
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Failure Law of Soft and Hard Interlayer Overlying Rock in Gently Inclined, Super‐Thick Coal Seam and Research on the Development Height of a Water‐Conducting Fissure Zone

Tong Zhao, Guang Wen, Peng Li, Hui Kang et al.
4 citations
Energy Science & Engineering
Geomechanics and Mining Engineering
3.45
article

Failure Law of Soft and Hard Interlayer Overlying Rock in Gently Inclined, Super‐Thick Coal Seam and Research on the Development Height of a Water‐Conducting Fissure Zone

Tong Zhao, Guang Wen, Peng Li, Hui Kang, Kang Yi, Kaijie Duan, Peilin Gong, Ziyang Feng
article en
4 citations

Abstract

ABSTRACT This study examines the failure laws of soft and hard interlayer overlying rocks and the development height of the water‐conducting fracture zone in a gently inclined super‐thick coal seam at the Qifeng coal mine, Shanxi. The overlying rocks above the working face were classified into four typical structural types: soft‐hard‐soft‐hard, hard‐soft‐hard‐soft, soft‐soft‐hard‐hard, and hard‐hard‐soft‐soft. First, the failure laws of these four types of overlying rock structures were studied theoretically. Theoretical analysis revealed that different overlying rock structures form different composite rock beams that move synchronously after coal excavation. Numerical simulation using FLAC 3D showed that the overburden failure does not change linearly but forms different combined rock beams according to the different overburden structures, resulting in a step change. The soft–soft–hard–hard overburden structure exhibits the largest damage extent, while the soft–hard–soft–hard overburden structure results in the highest damage height. When the hard rock above the coal seam is closer to the stope, the influence of the mining stress is greater, leading to stress concentration at the junction of soft and hard rocks. Three methods—theoretical analysis, numerical simulation, and field measurement—were used to study the overlying rock failure law and the development height of the water‐conducting fracture zone of the 51408 working face of the Qifeng Coal industry. The results show that the guiding height of the 51408 working face of the Qifeng Coal industry is 120.12, 103.6, 113.2, and 116.1 m for the four overlying rock structures. The maximum measured height of 116.1 m was considered the development height of the water‐conducting fracture zone. The field‐measured results are consistent with those obtained by theoretical calculation and numerical simulation, confirming the accuracy of the theoretical analysis and numerical simulation and providing a basis for water prevention and control of the roof of gently tilting super‐thick coal seams.

Energy Science & EngineeringVol. 13(7)
Shanxi Jincheng Anthracite Mining Group (China) (CN), Taiyuan University of Technology (CN)
Openalex Percentile: Top 8%
Geomechanics and Mining Engineering
3.45
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.