Analysis of the Performance of the HDPE Pipe 450 Installation Project in Relation to Cost and Time Using the Earned Value Method

Construction project work requires regular monitoring to determine project performance based on the work that has been realized. The purpose of this study is to evaluate cost and time performance while estimating the time and cost of completing the drainage pipe project for each reporting period. In this study, the Earned Value Method is used to measure performance by comparing planned work with realized work, as well as the actual cost of the work. The results of the 12th week of research showed that the cost of project implementation was lower than planned, as indicated by the Cost Variant value of +117,923,808.28 (1.37%), Cost Performance Index of 1.01 (> 1), Schedule Variant of +1,731,414,451.68 (20.08%), and Schedule Performance Index of 1.25 (> 1). The results of the above indicators indicate that the project was implemented faster than planned. The results of the calculation of the estimated time for the first to third weeks remain consistent with the plan, which is 14 weeks, while for the fourth to twelfth weeks it is lower than planned. The results of the cost evaluation show that from the first week to the fifth week, the average final cost of completing the project was 102.54% higher than the planned budget, while from the sixth week to the twelfth week, the final cost of the project was 90.01% lower than the planned budget of 100%.

Authors

Institutions

Publication Details

Journal
MEDIA KOMUNIKASI TEKNIK SIPIL
Published
2025-03-17
DOI
https://doi.org/10.14710/mkts.v30i2.60714
Primary Topic
Engineering Applied Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of the Performance of the HDPE Pipe 450 Installation Project in Relation to Cost and Time Using the Earned Value Method

Dafid Irawan, Aji Suraji, Emanuel Paihaf Hafum
MEDIA KOMUNIKASI TEKNIK SIPIL
Engineering Applied Research
article

Analysis of the Performance of the HDPE Pipe 450 Installation Project in Relation to Cost and Time Using the Earned Value Method

Dafid Irawan, Aji Suraji, Emanuel Paihaf Hafum
article en

Abstract

Construction project work requires regular monitoring to determine project performance based on the work that has been realized. The purpose of this study is to evaluate cost and time performance while estimating the time and cost of completing the drainage pipe project for each reporting period. In this study, the Earned Value Method is used to measure performance by comparing planned work with realized work, as well as the actual cost of the work. The results of the 12th week of research showed that the cost of project implementation was lower than planned, as indicated by the Cost Variant value of +117,923,808.28 (1.37%), Cost Performance Index of 1.01 (> 1), Schedule Variant of +1,731,414,451.68 (20.08%), and Schedule Performance Index of 1.25 (> 1). The results of the above indicators indicate that the project was implemented faster than planned. The results of the calculation of the estimated time for the first to third weeks remain consistent with the plan, which is 14 weeks, while for the fourth to twelfth weeks it is lower than planned. The results of the cost evaluation show that from the first week to the fifth week, the average final cost of completing the project was 102.54% higher than the planned budget, while from the sixth week to the twelfth week, the final cost of the project was 90.01% lower than the planned budget of 100%.

MEDIA KOMUNIKASI TEKNIK SIPILVol. 30(2)
Universitas Widya Gama Malang (ID)
Openalex Percentile: Top 91%
Engineering Applied Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of the Performance of the HDPE Pipe 450 Installation Project in Relation to Cost and Time Using the Earned Value Method — Dafid Irawan, Aji Suraji, et al. · MEDIA KOMUNIKASI TEKNIK SIPIL (2025) | TGRS Research Map | TGRS