Optimization of Production Scheduling to Minimize Makespan in the 54-Ton Flat Carriage Project at PT INKA Multi Solusi

Efficient production scheduling is essential to achieve optimal operational goals in the manufacturing industry. This study aims to optimize production scheduling on a 54 Ton Flat Carriage manufacturing project at PT INKA Multi Solusi using the Nawaz, Enscore, and Ham (NEH) Method. The main focus of this study is to minimize the total completion time (makespan) in order to improve operational efficiency, reduce costs, and meet deadlines and quality standards that have been set. The NEH method is applied to compare the results with the method commonly used by the company, namely First Come First Serve (FCFS). The results show that the NEH method produces a smaller makespan (1.39 hours) compared to the FCFS method which produces a makespan of 1.41 hours. Thus, the NEH method is proven to be more efficient in reducing makespan and can be used as a reference for better production scheduling. This study also contributes to the allocation of limited resources such as machines, labor, and raw materials, in order to increase the company's productivity and competitiveness amidst the tight competition in the manufacturing industry

Authors

Institutions

Publication Details

Journal
JKIE (Journal Knowledge Industrial Engineering)
Published
2025-04-30
DOI
https://doi.org/10.35891/jkie.v12i1.5912
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Production Scheduling to Minimize Makespan in the 54-Ton Flat Carriage Project at PT INKA Multi Solusi

Erina Mu’rivatul Wilda, Sumiati
JKIE (Journal Knowledge Industrial Engineering)
Management and Optimization Techniques
article

Optimization of Production Scheduling to Minimize Makespan in the 54-Ton Flat Carriage Project at PT INKA Multi Solusi

Erina Mu’rivatul Wilda, Sumiati
article en

Abstract

Efficient production scheduling is essential to achieve optimal operational goals in the manufacturing industry. This study aims to optimize production scheduling on a 54 Ton Flat Carriage manufacturing project at PT INKA Multi Solusi using the Nawaz, Enscore, and Ham (NEH) Method. The main focus of this study is to minimize the total completion time (makespan) in order to improve operational efficiency, reduce costs, and meet deadlines and quality standards that have been set. The NEH method is applied to compare the results with the method commonly used by the company, namely First Come First Serve (FCFS). The results show that the NEH method produces a smaller makespan (1.39 hours) compared to the FCFS method which produces a makespan of 1.41 hours. Thus, the NEH method is proven to be more efficient in reducing makespan and can be used as a reference for better production scheduling. This study also contributes to the allocation of limited resources such as machines, labor, and raw materials, in order to increase the company's productivity and competitiveness amidst the tight competition in the manufacturing industry

JKIE (Journal Knowledge Industrial Engineering)Vol. 12(1)
University of Pembangunan Nasional Veteran Jawa Timur (ID)
Openalex Percentile: Top 87%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.