Abstract The EU Green Deal calls for a rapid and efficient green transition. On-going climate change and an increasing need for secure and sustainable energy means ambitious projects and goals are accelerated. To expand and exchange offshore wind energy across North Sea neighbouring countries, the Danish government presented in 2020 the Danish North Sea Energy Island (NSEI) project. This pilot project illustrates the shift from ‘nationally individualistic’ modes of connecting offshore wind energy projects, to supplying a multi-lateral renewable offshore energy grid. The Energy Island project builds on the Hub-and-Spoke (H&S) approach, which introduces a new level of complexity to governing the next generation of offshore wind energy projects. This paper analyses the political motivations for the Danish project and the planning and implementation of the Energy Islands, integrating a combination of collaborative and transboundary governance perspectives. The qualitative analysis is based on a document analysis and a literature review. Findings show how planning for the Danish Energy Island has faced delays and challenges, causing uncertainties about the Island’s capability to support Green Deal goals, as well as a mismatch between political ambitions and practical implementation. The artificial offshore island is currently under reconsideration due to costs and is, as of March 2024, still in its planning phase. This case study on the Danish NSEI serves as an introduction to the general functionalities and development of the Island and defines a Danish Energy Island. Results indicate that the combination of transboundary and collaborative governance structures are necessary as part of a successful implementation of Energy Islands.

Authors

Institutions

Publication Details

Journal
MAST. Maritime studies/Maritime studies
Published
2025-04-29
DOI
https://doi.org/10.1007/s40152-025-00427-y
Citations
6
Primary Topic
Social Acceptance of Renewable Energy
Type
article
Field-Weighted Citation Impact
25.21

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Big projects, political ambitions and preparing for the green energy transition - the North Sea Energy Island in Denmark

Sun Cole Seeberg Dyremose
6 citations
MAST. Maritime studies/Maritime studies
Social Acceptance of Renewable Energy
25.21
article

Big projects, political ambitions and preparing for the green energy transition - the North Sea Energy Island in Denmark

Sun Cole Seeberg Dyremose
article en
6 citations

Abstract

Abstract The EU Green Deal calls for a rapid and efficient green transition. On-going climate change and an increasing need for secure and sustainable energy means ambitious projects and goals are accelerated. To expand and exchange offshore wind energy across North Sea neighbouring countries, the Danish government presented in 2020 the Danish North Sea Energy Island (NSEI) project. This pilot project illustrates the shift from ‘nationally individualistic’ modes of connecting offshore wind energy projects, to supplying a multi-lateral renewable offshore energy grid. The Energy Island project builds on the Hub-and-Spoke (H&S) approach, which introduces a new level of complexity to governing the next generation of offshore wind energy projects. This paper analyses the political motivations for the Danish project and the planning and implementation of the Energy Islands, integrating a combination of collaborative and transboundary governance perspectives. The qualitative analysis is based on a document analysis and a literature review. Findings show how planning for the Danish Energy Island has faced delays and challenges, causing uncertainties about the Island’s capability to support Green Deal goals, as well as a mismatch between political ambitions and practical implementation. The artificial offshore island is currently under reconsideration due to costs and is, as of March 2024, still in its planning phase. This case study on the Danish NSEI serves as an introduction to the general functionalities and development of the Island and defines a Danish Energy Island. Results indicate that the combination of transboundary and collaborative governance structures are necessary as part of a successful implementation of Energy Islands.

MAST. Maritime studies/Maritime studiesVol. 24(2)
Aalborg University (DK)
Aalborg Universitet, Wageningen University and Research
Affordable and clean energy
Openalex Percentile: Top 1%
Social Acceptance of Renewable Energy
25.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Big projects, political ambitions and preparing for the green energy transition - the North Sea Energy Island in Denmark — Sun Cole Seeberg Dyremose · MAST. Maritime studies/Maritime studies (2025) | TGRS Research Map | TGRS