PERFORMANCE OF SUSTAINABLE CONSTRUCTION PROJECTS: A CONTRACTOR’S VIEWPOINT

Achieving stakeholder satisfaction and attaining the objectives are considered indicators of success in construction projects. Performance criteria may consist of one or more indicators influenced by project's stakeholders and characteristics. This study uses an exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) to determine the key indicators affecting project performance from the contractors’ viewpoint. A set of 120 structured quantitative questionnaires survey were distributed to actively registered G7 contractor companies in Pulau Pinang. Ten hypothesized factors consisting of 42 indicators were measured using a five-point Likert scale and subsequently analyzed using SPSS software. Results of EFA showed eight re-evaluating affected factors of construction project performance in Pulau Pinang; most notably, factors such as Labor, equipment, consultant, and contract (LCC) which consists of fifteen indicators, giving factors loading of 0.495 to 0.804, Eigenvalues (20.5), and variance (48.9%). Based on stakeholders’ perspective, CFA identified four statistically significant project performance factors: LCC, People, Time, and Project characteristic with factor loading and covariance values > 0.7 and < 0.8, respectively. By pinpointing these factors and validating them via a dual-phase statistical approach, this study provides actionable insights for enhancing performance in sustainable construction projects, offering practical value to stakeholders and contractors in similar contexts, particularly during difficult situation in project delivery.

Authors

Institutions

Publication Details

Journal
Journal of Civil Engineering Science and Technology
Published
2025-04-29
DOI
https://doi.org/10.33736/jcest.6980.2025
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERFORMANCE OF SUSTAINABLE CONSTRUCTION PROJECTS: A CONTRACTOR’S VIEWPOINT

Nur Adila Ab Aziz, Nur Rahmahwati Syamsyiah, Siti Aisyah Ishak, Afizah Ayob et al.
Journal of Civil Engineering Science and Technology
Construction Project Management and Performance
article

PERFORMANCE OF SUSTAINABLE CONSTRUCTION PROJECTS: A CONTRACTOR’S VIEWPOINT

Nur Adila Ab Aziz, Nur Rahmahwati Syamsyiah, Siti Aisyah Ishak, Afizah Ayob, AO Abd El Halim, Mustaqqim Abdul Rahim, Umi Farishah Mohd Shoeb
article en

Abstract

Achieving stakeholder satisfaction and attaining the objectives are considered indicators of success in construction projects. Performance criteria may consist of one or more indicators influenced by project's stakeholders and characteristics. This study uses an exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) to determine the key indicators affecting project performance from the contractors’ viewpoint. A set of 120 structured quantitative questionnaires survey were distributed to actively registered G7 contractor companies in Pulau Pinang. Ten hypothesized factors consisting of 42 indicators were measured using a five-point Likert scale and subsequently analyzed using SPSS software. Results of EFA showed eight re-evaluating affected factors of construction project performance in Pulau Pinang; most notably, factors such as Labor, equipment, consultant, and contract (LCC) which consists of fifteen indicators, giving factors loading of 0.495 to 0.804, Eigenvalues (20.5), and variance (48.9%). Based on stakeholders’ perspective, CFA identified four statistically significant project performance factors: LCC, People, Time, and Project characteristic with factor loading and covariance values > 0.7 and < 0.8, respectively. By pinpointing these factors and validating them via a dual-phase statistical approach, this study provides actionable insights for enhancing performance in sustainable construction projects, offering practical value to stakeholders and contractors in similar contexts, particularly during difficult situation in project delivery.

Journal of Civil Engineering Science and TechnologyVol. 16(1)
Muhammadiyah University of Surakarta (ID), Politeknik Tuanku Syed Sirajuddin (MY), Universiti Malaysia Perlis (MY)
Universiti Malaysia Perlis
Openalex Percentile: Top 90%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.