Avaliação dos custos do compartilhamento da mão de obra na construção civil

Construction contributes to regional development, and proper cost management directly impacts territorial infrastructure and economic sustainability. In this context, the objective is to analyze the costs of shared labor in a company in the construction sector in the city of Foz do Iguaçu-PR. This is a case study in which the data was obtained from financial reports provided by the company. Tabulating the data allowed the results of comparative calculations involving time, activity and labor spent between the categories of workers involved in construction to be obtained. There was a significant variation in labor costs on sites where workers were shared. The study identified that deviations not foreseen in projects and budgets, such as the simultaneous allocation of labor to multiple works, make it difficult to calculate costs and compromise economic results. Keywords: construction management; construction costs; budget control.

Authors

Institutions

Publication Details

Journal
DRd - Desenvolvimento Regional em debate
Published
2025-04-29
DOI
https://doi.org/10.24302/drd.v15.5628
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Avaliação dos custos do compartilhamento da mão de obra na construção civil

Eloisa Lopes Soares Lima, Nilton César Lima, José Antônio Cescon, João Cândido Rodrigues et al.
DRd - Desenvolvimento Regional em debate
Construction Project Management and Performance
article

Avaliação dos custos do compartilhamento da mão de obra na construção civil

Eloisa Lopes Soares Lima, Nilton César Lima, José Antônio Cescon, João Cândido Rodrigues, João Antônio Pimenta Cescon
article en

Abstract

Construction contributes to regional development, and proper cost management directly impacts territorial infrastructure and economic sustainability. In this context, the objective is to analyze the costs of shared labor in a company in the construction sector in the city of Foz do Iguaçu-PR. This is a case study in which the data was obtained from financial reports provided by the company. Tabulating the data allowed the results of comparative calculations involving time, activity and labor spent between the categories of workers involved in construction to be obtained. There was a significant variation in labor costs on sites where workers were shared. The study identified that deviations not foreseen in projects and budgets, such as the simultaneous allocation of labor to multiple works, make it difficult to calculate costs and compromise economic results. Keywords: construction management; construction costs; budget control.

DRd - Desenvolvimento Regional em debateVol. 15
Universidade Estadual do Oeste do Paraná (BR), Universidade Federal de Uberlândia (BR)
Openalex Percentile: Top 90%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.