Material Requirement Planning (MRP) Pada Pekerjaan Proyek Peningkatan Jalan Klasari-Wonosobo Kabupaten Sorong

Material mobilization in Eastern Indonesia is different from other locations, difficult road access will cause large shipping prices, so it can affect the increase in the price of a material. The success of a construction work cannot be separated from the optimization of the implementation of three main components, namely cost, time and quality. Each component plays an important role and is interdependent with each other. One of the methods that may be used in material procurement planning is Material Requirement Planning or called MRP. From the problem of scheduling the arrival of materials in the Klasari – Wonosobo Road Improvement project, Sorong Regency, MRP (Material Requirement Planning) can be analyzed, starting with making project scheduling and then continuing with planning the ordering of materials needed during the project with the lot sizing method to produce more efficient material supply time so that it can be used and applied by contractors to plan more material purchases effective and efficient. The results of the research were the material needs of concrete road structures and talud structures in the Klasari-Wonosobo road improvement project in Sorong Regency using the requirement planning method, 925,161 kg of cement material was obtained; rough ggregate ; 2,288,752.50 kg ; Fine agregate 1,545,822 kg ; U24 plain iron 20,259.44 kg; U32 threaded iron 3,181.73 kg and water 490,074 liters. The material that is broken down is cement; rough agregate ; smooth agregate; U24 plain iron and U32 iron. In this MRP method, the material with the largest amount is the most suitable in terms of procurement, storage and use, namely coarse ggregate; 2,288,752.50 kg compared to other materials.

Authors

Institutions

Publication Details

Journal
Jurnal TESLINK Teknik Sipil dan Lingkungan
Published
2025-03-09
DOI
https://doi.org/10.52005/teslink.v1i1.575
Citations
1
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
2.23
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Material Requirement Planning (MRP) Pada Pekerjaan Proyek Peningkatan Jalan Klasari-Wonosobo Kabupaten Sorong

Watono, Frans Howay, Hanafi Ashad
1 citations
Jurnal TESLINK Teknik Sipil dan Lingkungan
Management and Optimization Techniques
2.23
article

Material Requirement Planning (MRP) Pada Pekerjaan Proyek Peningkatan Jalan Klasari-Wonosobo Kabupaten Sorong

Watono, Frans Howay, Hanafi Ashad
article en
1 citations

Abstract

Material mobilization in Eastern Indonesia is different from other locations, difficult road access will cause large shipping prices, so it can affect the increase in the price of a material. The success of a construction work cannot be separated from the optimization of the implementation of three main components, namely cost, time and quality. Each component plays an important role and is interdependent with each other. One of the methods that may be used in material procurement planning is Material Requirement Planning or called MRP. From the problem of scheduling the arrival of materials in the Klasari – Wonosobo Road Improvement project, Sorong Regency, MRP (Material Requirement Planning) can be analyzed, starting with making project scheduling and then continuing with planning the ordering of materials needed during the project with the lot sizing method to produce more efficient material supply time so that it can be used and applied by contractors to plan more material purchases effective and efficient. The results of the research were the material needs of concrete road structures and talud structures in the Klasari-Wonosobo road improvement project in Sorong Regency using the requirement planning method, 925,161 kg of cement material was obtained; rough ggregate ; 2,288,752.50 kg ; Fine agregate 1,545,822 kg ; U24 plain iron 20,259.44 kg; U32 threaded iron 3,181.73 kg and water 490,074 liters. The material that is broken down is cement; rough agregate ; smooth agregate; U24 plain iron and U32 iron. In this MRP method, the material with the largest amount is the most suitable in terms of procurement, storage and use, namely coarse ggregate; 2,288,752.50 kg compared to other materials.

Jurnal TESLINK Teknik Sipil dan LingkunganVol. 7(1)
Universitas Muslim Indonesia (ID)
Openalex Percentile: Top 12%
Management and Optimization Techniques
2.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.