A two-stage heuristic algorithm for dynamic seru scheduling problems with resource constraints

Originating from the Japanese electronics assembly industry, the seru production mode offers high efficiency, flexibility, and rapid responsiveness in manufacturing. This paper addresses the unspecified dynamic seru scheduling problem with resource constraints (UDSS-R), where resource usage must not exceed the available total at any given time. The UDSS-R problem is formulated as a mixed-integer linear programming (MILP) model aimed at minimizing the makespan. A two-stage heuristic algorithm is proposed subsequently: the first stage addresses the regular seru scheduling problem (without resource constraints) by assigning jobs to serus, and the second stage uses a dynamic programming algorithm based on the 0-1 knapsack problem to finalize the schedule. Computational experiments demonstrate the practicality and effectiveness of the proposed MILP model and the two-stage heuristic algorithm in solving the UDSS-R problem

Authors

Institutions

Publication Details

Journal
Scientia Iranica
Published
2024-11-27
DOI
https://doi.org/10.24200/sci.2024.62411.7826
Citations
1
Primary Topic
Healthcare Operations and Scheduling Optimization
Type
article
Field-Weighted Citation Impact
0.74

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A two-stage heuristic algorithm for dynamic seru scheduling problems with resource constraints

Yiran Xiang, Zhe Zhang, Yong Yin, Xue Gong et al.
1 citations
Scientia Iranica
Healthcare Operations and Scheduling Optimization
0.74
article

A two-stage heuristic algorithm for dynamic seru scheduling problems with resource constraints

Yiran Xiang, Zhe Zhang, Yong Yin, Xue Gong, Xiaoling Song
article en
1 citations

Abstract

Originating from the Japanese electronics assembly industry, the seru production mode offers high efficiency, flexibility, and rapid responsiveness in manufacturing. This paper addresses the unspecified dynamic seru scheduling problem with resource constraints (UDSS-R), where resource usage must not exceed the available total at any given time. The UDSS-R problem is formulated as a mixed-integer linear programming (MILP) model aimed at minimizing the makespan. A two-stage heuristic algorithm is proposed subsequently: the first stage addresses the regular seru scheduling problem (without resource constraints) by assigning jobs to serus, and the second stage uses a dynamic programming algorithm based on the 0-1 knapsack problem to finalize the schedule. Computational experiments demonstrate the practicality and effectiveness of the proposed MILP model and the two-stage heuristic algorithm in solving the UDSS-R problem

Scientia IranicaVol. 0(0)
Doshisha University (JP), Nanjing University of Science and Technology (CN)
National Natural Science Foundation of China
Decent work and economic growth
Openalex Percentile: Top 22%
Healthcare Operations and Scheduling Optimization
0.74
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A two-stage heuristic algorithm for dynamic seru scheduling problems with resource constraints — Yiran Xiang, Zhe Zhang, et al. · Scientia Iranica (2024) | TGRS Research Map | TGRS