Implementasi Manajemen Proyek Pembangunan Radar Cuaca Tipe C-Band dan S-Band

The implementation of weather radar development projects requires optimal management to ensure timely completion, budget adherence, and expected quality. This study analyzes the application of project management in the procurement and installation of C-Band and S-Band weather radars in Indonesia. The methods used include project scope identification, detailed task structuring, critical path analysis, and risk mitigation strategies at each project stage. The results show that the key factors influencing project success are structured time planning, human resource coordination, and risk management throughout the process, from procurement to final testing. With effective project management, weather radar projects can be executed more efficiently and contribute to improving Indonesia’s weather monitoring system

Authors

Institutions

Publication Details

Journal
Ranah Research Journal of Multidisciplinary Research and Development
Published
2025-04-28
DOI
https://doi.org/10.38035/rrj.v7i4.1554
Primary Topic
Computer Science and Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementasi Manajemen Proyek Pembangunan Radar Cuaca Tipe C-Band dan S-Band

Maulana Putra
Ranah Research Journal of Multidisciplinary Research and Development
Computer Science and Engineering
article

Implementasi Manajemen Proyek Pembangunan Radar Cuaca Tipe C-Band dan S-Band

Maulana Putra
article en

Abstract

The implementation of weather radar development projects requires optimal management to ensure timely completion, budget adherence, and expected quality. This study analyzes the application of project management in the procurement and installation of C-Band and S-Band weather radars in Indonesia. The methods used include project scope identification, detailed task structuring, critical path analysis, and risk mitigation strategies at each project stage. The results show that the key factors influencing project success are structured time planning, human resource coordination, and risk management throughout the process, from procurement to final testing. With effective project management, weather radar projects can be executed more efficiently and contribute to improving Indonesia’s weather monitoring system

Ranah Research Journal of Multidisciplinary Research and DevelopmentVol. 7(4)
Meteorological, Climatological, And Geophysical Agency (ID)
Openalex Percentile: Top 96%
Computer Science and Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.