Potensi Bendung Irigasi Sebagai Pembangkit Listrik Tenaga Mikrohidro

Sei Padang Dam is a dam that dams the flow of the Padang River specifically to meet the needs of 3 irrigation areas, namely Paya Lombang, Langgau and Bajayu. Sei Padang Dam is currently only used as an irrigation channel and the potential energy that can be produced is not yet known. This study utilizes dam structures that have been completed such as intake channels, headrace channels, forebays and tailrace channels. This potential analysis was carried out using several methods, such as measuring the head using Google Earth, and using irrigation water discharge data from BWS Wil II Sumatra. The results of the study showed that Sei Padang Dam has a PLTMH potential of 50 kW with a water discharge of 2 m3/second and a water fall height/head reaching 4 meters. The most optimal turbine type is the Archimedes screw turbine type.

Authors

Institutions

Publication Details

Journal
JITEKH
Published
2024-09-26
DOI
https://doi.org/10.35447/jitekh.v12i2.947
Citations
2
Primary Topic
Water and Land Management
Type
article
Field-Weighted Citation Impact
1.42
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Potensi Bendung Irigasi Sebagai Pembangkit Listrik Tenaga Mikrohidro

Ahmad Taufik
2 citations
JITEKH
Water and Land Management
1.42
article

Potensi Bendung Irigasi Sebagai Pembangkit Listrik Tenaga Mikrohidro

Ahmad Taufik
article en
2 citations

Abstract

Sei Padang Dam is a dam that dams the flow of the Padang River specifically to meet the needs of 3 irrigation areas, namely Paya Lombang, Langgau and Bajayu. Sei Padang Dam is currently only used as an irrigation channel and the potential energy that can be produced is not yet known. This study utilizes dam structures that have been completed such as intake channels, headrace channels, forebays and tailrace channels. This potential analysis was carried out using several methods, such as measuring the head using Google Earth, and using irrigation water discharge data from BWS Wil II Sumatra. The results of the study showed that Sei Padang Dam has a PLTMH potential of 50 kW with a water discharge of 2 m3/second and a water fall height/head reaching 4 meters. The most optimal turbine type is the Archimedes screw turbine type.

JITEKHVol. 12(2)
Universitas Pembangunan Panca Budi Medan (ID)
Openalex Percentile: Top 13%
Water and Land Management
1.42
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines