An Innovative and Successful Subsea Approach for BS-4 Atlanta Field Development

Abstract This paper presents an innovative and successful subsea construction work case performed in March 2023 by a semi-submersible drilling rig in Atlanta Field, offshore Brazil, describing the motivation, opportunities and the development of the concept, engineering, viability and outcomes to the transition from Atlanta Early Production System (EPS) to the Full Field Development (FFD). The EPS comprises three wells in a drill center nominated by ‘South Cluster’ connected to the FPSO Petrojarl I, producing since 2018. As part of Atlanta FFD, three new wells have been drilled – two in the ‘North Cluster’ and one in the ‘South Cluster’ which is the object of this paper. The same semi-submersible Drilling rig who carried the promising well 7-ATL-5H-RJS drilling performed subsequent interconnection as part of the transition to the Atlanta FFD achieving a major milestone for the industry.

Authors

Institutions

Publication Details

Journal
Offshore Technology Conference
Published
2025-04-28
DOI
https://doi.org/10.4043/35648-ms
Citations
1
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
2.13
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Innovative and Successful Subsea Approach for BS-4 Atlanta Field Development

Valéria Rêgo Alves Pereira, Fernando Libório, M. Beatriz P.P. Oliveira
1 citations
Offshore Technology Conference
Offshore Engineering and Technologies
2.13
article

An Innovative and Successful Subsea Approach for BS-4 Atlanta Field Development

Valéria Rêgo Alves Pereira, Fernando Libório, M. Beatriz P.P. Oliveira
article en
1 citations

Abstract

Abstract This paper presents an innovative and successful subsea construction work case performed in March 2023 by a semi-submersible drilling rig in Atlanta Field, offshore Brazil, describing the motivation, opportunities and the development of the concept, engineering, viability and outcomes to the transition from Atlanta Early Production System (EPS) to the Full Field Development (FFD). The EPS comprises three wells in a drill center nominated by ‘South Cluster’ connected to the FPSO Petrojarl I, producing since 2018. As part of Atlanta FFD, three new wells have been drilled – two in the ‘North Cluster’ and one in the ‘South Cluster’ which is the object of this paper. The same semi-submersible Drilling rig who carried the promising well 7-ATL-5H-RJS drilling performed subsequent interconnection as part of the transition to the Atlanta FFD achieving a major milestone for the industry.

Offshore Technology Conference
Agência Nacional de Energia Elétrica (BR)
Openalex Percentile: Top 13%
Offshore Engineering and Technologies
2.13
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines