Data Management for Digital Twin in Large Capital EPCI Project

Abstract This paper presents a data management framework in the EPCI phase of FPSO projects. The data generated during the EPCI phase serves as critical upstream input for various applications in the operational phase. As advanced AI and digital twin models are increasingly adopted during operations, the integrity of the data is the foundation to meet the demands of these digital tools. This paper details our approach to handling data management and consistency, making it ready for AI and digital twin applications. In the EPCI phase, an FPSO contractor collaborates with numerous subcontractors, vendors and software applications that supply diverse types of data. This data includes structured data and unstructured data. When building a digital platform for the entire FPSO as a single source of truth, it is essential to consolidate, ensure consistency, compliance, completeness of data, and cross-check the data across the data sources linked to the digital twin. We use equipment tags as unique identifiers to link data across various sources, including 1D data (e.g., tag lists, engineering databases), 2D data (e.g., P&IDs, drawings), and 3D data (e.g., 3D models). EPC main contractor receives tag lists from multiple vendors and subcontractors. These tag lists are mostly generated manually by vendors/subcontractors which results in missing and inconsistent tags. A central tag register system is established to validate, consolidate, and correlate tags. This is then compared to our in-house developed Tag Extractor tool which automatically extracts data from PDFs using a computer vision-based AI algorithm. All output is being ingested to digital twin and have consolidated view of tag inconsistencies across mentioned sources. The developed central tagging registration system and data management framework have been successfully deployed in our recent projects. A use case study has demonstrated that this framework has been able to detect 90,000 + data inconsistencies and resolve them in early phases of MC/Commissioning and CMMS Build activities. Additionally, the KPI dashboard monitoring data consistency as the project progresses has enhanced data management efficiency.

Authors

Institutions

Publication Details

Journal
Offshore Technology Conference
Published
2025-04-28
DOI
https://doi.org/10.4043/35956-ms
Primary Topic
Technology Assessment and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Data Management for Digital Twin in Large Capital EPCI Project

Wayne Chen, Seemesh Pillai, Rei Yasumuro, Neil Cataag et al.
Offshore Technology Conference
Technology Assessment and Management
article

Data Management for Digital Twin in Large Capital EPCI Project

Wayne Chen, Seemesh Pillai, Rei Yasumuro, Neil Cataag, Kuan Yuen Quek
article en

Abstract

Abstract This paper presents a data management framework in the EPCI phase of FPSO projects. The data generated during the EPCI phase serves as critical upstream input for various applications in the operational phase. As advanced AI and digital twin models are increasingly adopted during operations, the integrity of the data is the foundation to meet the demands of these digital tools. This paper details our approach to handling data management and consistency, making it ready for AI and digital twin applications. In the EPCI phase, an FPSO contractor collaborates with numerous subcontractors, vendors and software applications that supply diverse types of data. This data includes structured data and unstructured data. When building a digital platform for the entire FPSO as a single source of truth, it is essential to consolidate, ensure consistency, compliance, completeness of data, and cross-check the data across the data sources linked to the digital twin. We use equipment tags as unique identifiers to link data across various sources, including 1D data (e.g., tag lists, engineering databases), 2D data (e.g., P&IDs, drawings), and 3D data (e.g., 3D models). EPC main contractor receives tag lists from multiple vendors and subcontractors. These tag lists are mostly generated manually by vendors/subcontractors which results in missing and inconsistent tags. A central tag register system is established to validate, consolidate, and correlate tags. This is then compared to our in-house developed Tag Extractor tool which automatically extracts data from PDFs using a computer vision-based AI algorithm. All output is being ingested to digital twin and have consolidated view of tag inconsistencies across mentioned sources. The developed central tagging registration system and data management framework have been successfully deployed in our recent projects. A use case study has demonstrated that this framework has been able to detect 90,000 + data inconsistencies and resolve them in early phases of MC/Commissioning and CMMS Build activities. Additionally, the KPI dashboard monitoring data consistency as the project progresses has enhanced data management efficiency.

Offshore Technology Conference
Technology Centre for Offshore and Marine, Singapore (SG)
Openalex Percentile: Top 74%
Technology Assessment and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.