Installation and Capacity Analyses of Offshore Torpedo Anchors

Abstract Torpedo anchors are dynamically installed anchors for the mooring systems of floating platforms and received the name of "torpedo" due to the cone head and the fin tail. Commonly used torpedo anchors have a diameter of around 1.0m (typically between 0.7 to 1.3m) and a length-to-diameter ratio of less than 20. During an offshore installation, the anchor will be lowered down to a height from the seabed about 50-100m. Once released from the releasing mechanism, the anchor will fall through the water column and penetrate into soil reaching the target depth within 10s. The target embedment is usually about 2-3 times the anchor length and will determine the holding capacity of the anchor. Torpedo anchors have been deployed multiple times in offshore Brazil as mooring anchors for floating production platforms, as flowline/riser initiation anchors, and as subsea well conductors with significant economic values. Despite the successful applications in offshore Brazil, the adoption of torpedo anchors in other offshore regions is rather limited if any. One possible reason might be the limited experience in the integrated study for torpedo anchors from installation to the final geotechnical capacity evaluation. Hence, the objective of this paper is to present the installation and geotechnical holding capacity methodologies for offshore torpedo anchors. Existing models, including the anchor hydrodynamic model in water, the anchor penetration model in soil, and the anchor geotechnical holding capacity model, are presented and assessed with the associated uncertainties quantified. Then, the design of a 120-tonne torpedo anchor is presented covering the installation and the final geotechnical holding capacity. Recommendations for future studies are provided in the final section to further mature and promote the wider adoption of the torpedo anchor technology.

Authors

Institutions

Publication Details

Journal
Offshore Technology Conference
Published
2025-04-28
DOI
https://doi.org/10.4043/35639-ms
Primary Topic
Vibration and Dynamic Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Installation and Capacity Analyses of Offshore Torpedo Anchors

Yong Luo, Tao Xing, Yunliang Shao, Qi Zhang et al.
Offshore Technology Conference
Vibration and Dynamic Analysis
article

Installation and Capacity Analyses of Offshore Torpedo Anchors

Yong Luo, Tao Xing, Yunliang Shao, Qi Zhang, Zhuo Wang, Jinbo Chen, Yuhan Zhao, Pin Xiu Ng
article en

Abstract

Abstract Torpedo anchors are dynamically installed anchors for the mooring systems of floating platforms and received the name of "torpedo" due to the cone head and the fin tail. Commonly used torpedo anchors have a diameter of around 1.0m (typically between 0.7 to 1.3m) and a length-to-diameter ratio of less than 20. During an offshore installation, the anchor will be lowered down to a height from the seabed about 50-100m. Once released from the releasing mechanism, the anchor will fall through the water column and penetrate into soil reaching the target depth within 10s. The target embedment is usually about 2-3 times the anchor length and will determine the holding capacity of the anchor. Torpedo anchors have been deployed multiple times in offshore Brazil as mooring anchors for floating production platforms, as flowline/riser initiation anchors, and as subsea well conductors with significant economic values. Despite the successful applications in offshore Brazil, the adoption of torpedo anchors in other offshore regions is rather limited if any. One possible reason might be the limited experience in the integrated study for torpedo anchors from installation to the final geotechnical capacity evaluation. Hence, the objective of this paper is to present the installation and geotechnical holding capacity methodologies for offshore torpedo anchors. Existing models, including the anchor hydrodynamic model in water, the anchor penetration model in soil, and the anchor geotechnical holding capacity model, are presented and assessed with the associated uncertainties quantified. Then, the design of a 120-tonne torpedo anchor is presented covering the installation and the final geotechnical holding capacity. Recommendations for future studies are provided in the final section to further mature and promote the wider adoption of the torpedo anchor technology.

Offshore Technology Conference
Shanghai Jiao Tong University (CN)
Openalex Percentile: Top 75%
Vibration and Dynamic Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.