Comprehensive Preparations for FPSO Disconnection: Ensuring Safe and Environmentally Responsible Decommissioning of BJSA Subsea Systems

Abstract The objective of this paper is to navigate through the preparatory works for the FPSO disconnection operations, including flushing the subsea system and isolation of the wells/XTs (Christmas Trees). The BJSA subsea system comprises three production manifolds, each connected to the FPSO via flexible risers/flowlines all looped back to the FPSO. Each manifold is equipped with four XTs connected by gas lift and production jumpers. In preparation for riser disconnection, a comprehensive flushing of the subsea system was performed, covering oil/gas lift systems and umbilicals. The gas export decommissioning posed additional challenges due to the absence of a loop back to the FPSO. Final subsea preparations for riser disconnection included isolating all XTs, which consisted of the disconnection of the jumpers and installation of additional physical barrier at the XT hubs (production, gas lift, or water injection). Most importantly, all scopes were delivered safely and reported no hydrocarbon leak to the environment.

Authors

Institutions

Publication Details

Journal
Offshore Technology Conference
Published
2025-04-28
DOI
https://doi.org/10.4043/36000-ms
Citations
4
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
8.51
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comprehensive Preparations for FPSO Disconnection: Ensuring Safe and Environmentally Responsible Decommissioning of BJSA Subsea Systems

Bruno Tonin, Felipe Duncan, Fernando Guamá
4 citations
Offshore Technology Conference
Marine and Offshore Engineering Studies
8.51
article

Comprehensive Preparations for FPSO Disconnection: Ensuring Safe and Environmentally Responsible Decommissioning of BJSA Subsea Systems

Bruno Tonin, Felipe Duncan, Fernando Guamá
article en
4 citations

Abstract

Abstract The objective of this paper is to navigate through the preparatory works for the FPSO disconnection operations, including flushing the subsea system and isolation of the wells/XTs (Christmas Trees). The BJSA subsea system comprises three production manifolds, each connected to the FPSO via flexible risers/flowlines all looped back to the FPSO. Each manifold is equipped with four XTs connected by gas lift and production jumpers. In preparation for riser disconnection, a comprehensive flushing of the subsea system was performed, covering oil/gas lift systems and umbilicals. The gas export decommissioning posed additional challenges due to the absence of a loop back to the FPSO. Final subsea preparations for riser disconnection included isolating all XTs, which consisted of the disconnection of the jumpers and installation of additional physical barrier at the XT hubs (production, gas lift, or water injection). Most importantly, all scopes were delivered safely and reported no hydrocarbon leak to the environment.

Offshore Technology Conference
Shell (Brazil)
Openalex Percentile: Top 1%
Marine and Offshore Engineering Studies
8.51
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.