GIRCS: An effective evolutionary scheme to solve SBM-RCPSP scheduling problems for industrial production planning

Resource Constrained Project Scheduling Problem (RCPSP) is a fundamental scheduling problem that has attracted much attention from researchers for many years. Many variants of this problem have been modeled, and many different approaches have been proposed and published in journals. However, the classical mathematical models of RCPSP still have some limitations that make it not really suitable for application in practical projects. This paper introduces practical applications and classifications of the RCPSP problem. After describing some common extensions of the original RCPSP problem, we briefly introduce three approaches that have been used to solve those extensions, including exact, heuristic, and metaheuristic algorithms. We define a novel scheduling problem named SBM-RCPSP (Skill-Based Makespan-RCPSP) which overcomes the limitations of previous variants of the RCPSP problem. The Graham representation of the SBM-RCPSP problem is introduced, and then the problem is proven to be NP-Hard. To solve the SBM-RCPSP problem, we propose an evolutionary algorithm called GIRCS inspired by Cuckoo Search and improved to reduce the total project execution time. Experimental results on datasets have demonstrated that the proposed scheme finds more efficient schedules than previous solutions.

Authors

Institutions

Publication Details

Journal
Intelligent Systems with Applications
Published
2025-04-26
DOI
https://doi.org/10.1016/j.iswa.2025.200522
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

GIRCS: An effective evolutionary scheme to solve SBM-RCPSP scheduling problems for industrial production planning

Huu Dang Quoc, Thi-Hao Nguyen, Loc Nguyen The
Intelligent Systems with Applications
Scheduling and Optimization Algorithms
article

GIRCS: An effective evolutionary scheme to solve SBM-RCPSP scheduling problems for industrial production planning

Huu Dang Quoc, Thi-Hao Nguyen, Loc Nguyen The
article en

Abstract

Resource Constrained Project Scheduling Problem (RCPSP) is a fundamental scheduling problem that has attracted much attention from researchers for many years. Many variants of this problem have been modeled, and many different approaches have been proposed and published in journals. However, the classical mathematical models of RCPSP still have some limitations that make it not really suitable for application in practical projects. This paper introduces practical applications and classifications of the RCPSP problem. After describing some common extensions of the original RCPSP problem, we briefly introduce three approaches that have been used to solve those extensions, including exact, heuristic, and metaheuristic algorithms. We define a novel scheduling problem named SBM-RCPSP (Skill-Based Makespan-RCPSP) which overcomes the limitations of previous variants of the RCPSP problem. The Graham representation of the SBM-RCPSP problem is introduced, and then the problem is proven to be NP-Hard. To solve the SBM-RCPSP problem, we propose an evolutionary algorithm called GIRCS inspired by Cuckoo Search and improved to reduce the total project execution time. Experimental results on datasets have demonstrated that the proposed scheme finds more efficient schedules than previous solutions.

Intelligent Systems with ApplicationsVol. 26
Hanoi National University of Education (VN), Thuongmai University (VN), Hung Vuong University of Ho Chi Minh City (VN), Hung Vuong University (VN)
Bộ Giáo dục và Ðào tạo
Openalex Percentile: Top 89%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

GIRCS: An effective evolutionary scheme to solve SBM-RCPSP scheduling problems for industrial production planning — Huu Dang Quoc, Thi-Hao Nguyen, et al. · Intelligent Systems with Applications (2025) | TGRS Research Map | TGRS