EVALUASI KINERJA BIAYA DAN WAKTU PELAKSANAAN MENGGUNAKAN METODE EARNED VALUE (EVM) (Studi Kasus: Proyek Pengendalian Banjir Kali Lamong)

The Kali Lamong Project is scheduled to be completed within 35 weeks with acontract value of Rp. 72,000,000,000,-. The purpose of this study is to determinecost and time performance, cost and time estimates at the end of project completionand the factors that cause delays or project progress. The method used in this studyis the Earned Value method which combines the elements of cost and time as well asthe physical performance of the work The data obtained from the project includesthe project time schedule, budget plan (RAB), project weekly reports and actualcosts, then an analysis of costs, schedules, variances and performance indexes iscarried out by explaining the problems that arise during the research. From theresults of the analysis it is known that the costs incurred are lower than thebudgeted costs indicated by the value of CPI = 1.12 and the implementation time isslower than the planned schedule indicated by the value of SPI = 0.71. The resultsof the calculation of the estimated final project cost of Rp. 67,952,500,564.98 withan estimated completion time of 43 weeks, indicating that the project experienced adelay of 8 weeks from the planned 35 weeks. This delay was caused by variousfactors such as delays in the initial erection of the project by a third party, damageto equipment, changes to the drawings by the planning consultant and changes tothe design by the owner.

Authors

Institutions

Publication Details

Journal
Wahana Teknik Sipil Jurnal Pengembangan Teknik Sipil
Published
2024-12-01
DOI
https://doi.org/10.32497/wahanats.v29i2.6160
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EVALUASI KINERJA BIAYA DAN WAKTU PELAKSANAAN MENGGUNAKAN METODE EARNED VALUE (EVM) (Studi Kasus: Proyek Pengendalian Banjir Kali Lamong)

Senja Rum Harnaeni, Mochamad Solikin, Sri Sunarjono, Ferry Muhammad Annas
Wahana Teknik Sipil Jurnal Pengembangan Teknik Sipil
Management and Optimization Techniques
article

EVALUASI KINERJA BIAYA DAN WAKTU PELAKSANAAN MENGGUNAKAN METODE EARNED VALUE (EVM) (Studi Kasus: Proyek Pengendalian Banjir Kali Lamong)

Senja Rum Harnaeni, Mochamad Solikin, Sri Sunarjono, Ferry Muhammad Annas
article en

Abstract

The Kali Lamong Project is scheduled to be completed within 35 weeks with acontract value of Rp. 72,000,000,000,-. The purpose of this study is to determinecost and time performance, cost and time estimates at the end of project completionand the factors that cause delays or project progress. The method used in this studyis the Earned Value method which combines the elements of cost and time as well asthe physical performance of the work The data obtained from the project includesthe project time schedule, budget plan (RAB), project weekly reports and actualcosts, then an analysis of costs, schedules, variances and performance indexes iscarried out by explaining the problems that arise during the research. From theresults of the analysis it is known that the costs incurred are lower than thebudgeted costs indicated by the value of CPI = 1.12 and the implementation time isslower than the planned schedule indicated by the value of SPI = 0.71. The resultsof the calculation of the estimated final project cost of Rp. 67,952,500,564.98 withan estimated completion time of 43 weeks, indicating that the project experienced adelay of 8 weeks from the planned 35 weeks. This delay was caused by variousfactors such as delays in the initial erection of the project by a third party, damageto equipment, changes to the drawings by the planning consultant and changes tothe design by the owner.

Wahana Teknik Sipil Jurnal Pengembangan Teknik SipilVol. 29(2)
Muhammadiyah University of Surakarta (ID)
Openalex Percentile: Top 49%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.