Earthquake Risk Management for Mini-Hydro Power Plant: A Case Study Approach
This study evaluates the impact of an earthquake on a mini-hydropower plant (MHP) and formulates a disaster management strategy to enhance the operational resilience of MHPs against seismic events. Data was collected through interviews with relevant stakeholders, direct observations, and analysis of pertinent documents. The findings indicate that the 2018 Lombok earthquake caused severe damage to the catchment area, triggering increased sedimentation that disrupted the MHPs operation, resulting in decreased electricity production and escalated operational costs. Mitigation measures were implemented and proved effective in reducing debris-related downtime and improving electricity generation. Thes findings are expected to provide guidance for MHP operators in mitigating the negative impacts of earthquakes and similar disasters on plant operations.
Authors
- Syukri Muhammad Nur (ORCID: https://orcid.org/0000-0001-7373-8629)
- Aep Saepul Uyun (ORCID: https://orcid.org/0000-0003-4227-7668)
- Erkata Yandri (ORCID: https://orcid.org/0000-0003-2073-2586)
- Hafit Isandono
- Andy Tirta
Publication Details
- Journal
- Journal of Renewable Energy Electrical and Computer Engineering
- Published
- 2025-03-17
- DOI
- https://doi.org/10.29103/jreece.v5i1.18887
- Primary Topic
- Smart Grid Security and Resilience
- Type
- article
- Field-Weighted Citation Impact
- 0.00