IMPLEMENTATION OF TPM ( TOTAL PRODUCTIVE MAINTENANCE) METHOD ON FILLING LINE 4 MACHINE TO REDUCE REJECTS AND DOWNTIME AT PT.XYZ

XYZ is one of the manufacturing companies engaged in various kinds of cold drinks (beverages), located in Pasuruan regency. In this study, the focus is on the problem of waste defects or product defects in filling line 4 which results in decreased production quality and production targets that cannot be achieved, which results in many losses for the company because of the costs that have been incurred but the results are not according to the target. In the production process on line 4, there are often irregularities in the machine, especially in the filling machine which often experiences throubleshoot, resulting in a lot of waste defects that result in the production target not being achieved. Therefore, analysis and planning for machine repair are needed to reduce or eliminate engine downtime in the filling machine due to the stamp stuck in the line and resulting in product defects or waste defects. In an effort to reduceor eliminate engine downtime and waste defects, using the total productive maintenance (TPM) method, fishbown diagram, and 5W1H method but with certain stages and using lean tools to repair the machine.

Authors

Institutions

Publication Details

Journal
JKIE (Journal Knowledge Industrial Engineering)
Published
2025-04-26
DOI
https://doi.org/10.35891/jkie.v11i1.6171
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

IMPLEMENTATION OF TPM ( TOTAL PRODUCTIVE MAINTENANCE) METHOD ON FILLING LINE 4 MACHINE TO REDUCE REJECTS AND DOWNTIME AT PT.XYZ

Khusaeri
JKIE (Journal Knowledge Industrial Engineering)
Management and Optimization Techniques
article

IMPLEMENTATION OF TPM ( TOTAL PRODUCTIVE MAINTENANCE) METHOD ON FILLING LINE 4 MACHINE TO REDUCE REJECTS AND DOWNTIME AT PT.XYZ

Khusaeri
article en

Abstract

XYZ is one of the manufacturing companies engaged in various kinds of cold drinks (beverages), located in Pasuruan regency. In this study, the focus is on the problem of waste defects or product defects in filling line 4 which results in decreased production quality and production targets that cannot be achieved, which results in many losses for the company because of the costs that have been incurred but the results are not according to the target. In the production process on line 4, there are often irregularities in the machine, especially in the filling machine which often experiences throubleshoot, resulting in a lot of waste defects that result in the production target not being achieved. Therefore, analysis and planning for machine repair are needed to reduce or eliminate engine downtime in the filling machine due to the stamp stuck in the line and resulting in product defects or waste defects. In an effort to reduceor eliminate engine downtime and waste defects, using the total productive maintenance (TPM) method, fishbown diagram, and 5W1H method but with certain stages and using lean tools to repair the machine.

JKIE (Journal Knowledge Industrial Engineering)Vol. 11(1)
Universitas Yudharta Pasuruan (ID)
Openalex Percentile: Top 88%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.