Implementation of House of Risk (Hor) Model for Mitigating Raw Material Supply Chain Risk at PT. Raja Indonesia Perkasa

Supply chain activities always carry the potential for risk, which is why risk management is essential for addressing these risks. In companies that manufacture mattresses, such as PT Raja Indonesia Perkasa Suwayuwo, the supply chain activities related to leather raw materials are susceptible to various risks. Therefore, it is necessary to conduct a risk analysis and design mitigation actions to address or reduce the likelihood of risks or disruptions in the leather raw material supply chain. This study employs the House of Risk (HoR) model, which consists of two phases. The first phase involves identifying risks and risk agents, followed by measuring the severity and occurrence levels, as well as calculating the Aggregate Risk Priority (ARP) values. The second phase focuses on risk treatment. The results of the study show that there are 27 risk events and 52 risk agents identified. Furthermore, six mitigation actions have been proposed, which are expected to effectively mitigate the risks in the leather raw material supply chain.

Authors

Institutions

Publication Details

Journal
JKIE (Journal Knowledge Industrial Engineering)
Published
2025-04-26
DOI
https://doi.org/10.35891/jkie.v10i3.6176
Primary Topic
Supply Chain Resilience and Risk Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementation of House of Risk (Hor) Model for Mitigating Raw Material Supply Chain Risk at PT. Raja Indonesia Perkasa

Slamet Slamet
JKIE (Journal Knowledge Industrial Engineering)
Supply Chain Resilience and Risk Management
article

Implementation of House of Risk (Hor) Model for Mitigating Raw Material Supply Chain Risk at PT. Raja Indonesia Perkasa

Slamet Slamet
article en

Abstract

Supply chain activities always carry the potential for risk, which is why risk management is essential for addressing these risks. In companies that manufacture mattresses, such as PT Raja Indonesia Perkasa Suwayuwo, the supply chain activities related to leather raw materials are susceptible to various risks. Therefore, it is necessary to conduct a risk analysis and design mitigation actions to address or reduce the likelihood of risks or disruptions in the leather raw material supply chain. This study employs the House of Risk (HoR) model, which consists of two phases. The first phase involves identifying risks and risk agents, followed by measuring the severity and occurrence levels, as well as calculating the Aggregate Risk Priority (ARP) values. The second phase focuses on risk treatment. The results of the study show that there are 27 risk events and 52 risk agents identified. Furthermore, six mitigation actions have been proposed, which are expected to effectively mitigate the risks in the leather raw material supply chain.

JKIE (Journal Knowledge Industrial Engineering)Vol. 10(3)
Universitas Yudharta Pasuruan (ID)
Openalex Percentile: Top 88%
Supply Chain Resilience and Risk Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Implementation of House of Risk (Hor) Model for Mitigating Raw Material Supply Chain Risk at PT. Raja Indonesia Perkasa — Slamet Slamet · JKIE (Journal Knowledge Industrial Engineering) (2025) | TGRS Research Map | TGRS