Akuntansi Pertanggungjawaban dalam Penilaian Kinerja Pusat Biaya pada PLTM SION 2X5MW di Parlilitan

This study aims to determine the application of responsibility accounting in assessing cost centre performance at the SION 2x5MW MHP in Parlilitan. The research method used is descriptive method. From the results of the study it is known that the application of responsibility accounting has not gone well, because some of the requirements of responsibility accounting, namely the separation of controllable costs and uncontrollable costs, have not been applied in the preparation of the budget, so that the costs prepared by the company are not efficient and have not made the classification of account codes. PLTM SION 2x5MW also does not compare budget and realisation, performance assessment is measured from the timeliness of workmanship and cost.

Authors

Institutions

Publication Details

Journal
Jurnal Akuntansi Nommensen
Published
2025-04-25
DOI
https://doi.org/10.51622/jan.v2i2.2498
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Akuntansi Pertanggungjawaban dalam Penilaian Kinerja Pusat Biaya pada PLTM SION 2X5MW di Parlilitan

Ance Tampubolon, Audrey Siahaan, Jadongan Sijabat
Jurnal Akuntansi Nommensen
Management and Optimization Techniques
article

Akuntansi Pertanggungjawaban dalam Penilaian Kinerja Pusat Biaya pada PLTM SION 2X5MW di Parlilitan

Ance Tampubolon, Audrey Siahaan, Jadongan Sijabat
article en

Abstract

This study aims to determine the application of responsibility accounting in assessing cost centre performance at the SION 2x5MW MHP in Parlilitan. The research method used is descriptive method. From the results of the study it is known that the application of responsibility accounting has not gone well, because some of the requirements of responsibility accounting, namely the separation of controllable costs and uncontrollable costs, have not been applied in the preparation of the budget, so that the costs prepared by the company are not efficient and have not made the classification of account codes. PLTM SION 2x5MW also does not compare budget and realisation, performance assessment is measured from the timeliness of workmanship and cost.

Jurnal Akuntansi NommensenVol. 2(2)
University of HKBP Nommensen (ID)
Openalex Percentile: Top 88%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.