IMPLEMENTATION OF PSC COST RECOVERY AND PSC GROSS SPLIT CONTRACTS IN THE IYP FIELD

In producing oil and gas, Indonesia has two valid contract schemes, namely PSC Cost Recovery and PSC Gross Split. The IYP field is a field that has great potential in producing petroleum, with 25 workover and 2 infill wells. The scheme released to compare with the PSC Cost Recovery scheme is the Gross Split PSC scheme. The previous scheme was considered to be ineffective and still detrimental to the government. So the government issued Ministerial Regulation No. 52 of 2017 which is the result of a revision of Permen no. 8 of 2017. Gross Split PSC Scheme, the contractor bears all operational costs for the development of oil and gas fields. The economic research on the IYP field aims to compare the Cost Recovery PSC scheme with the Gross Split PSC.

Authors

Institutions

Publication Details

Journal
Petro Jurnal Ilmiah Teknik Perminyakan
Published
2025-04-25
DOI
https://doi.org/10.25105/petro.v13i3.16028
Primary Topic
Financial Reporting and Valuation Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

IMPLEMENTATION OF PSC COST RECOVERY AND PSC GROSS SPLIT CONTRACTS IN THE IYP FIELD

Bayu Satiyawira, Prayang Sunny Yulia, Irvan Yulian Pratama
Petro Jurnal Ilmiah Teknik Perminyakan
Financial Reporting and Valuation Research
article

IMPLEMENTATION OF PSC COST RECOVERY AND PSC GROSS SPLIT CONTRACTS IN THE IYP FIELD

Bayu Satiyawira, Prayang Sunny Yulia, Irvan Yulian Pratama
article en

Abstract

In producing oil and gas, Indonesia has two valid contract schemes, namely PSC Cost Recovery and PSC Gross Split. The IYP field is a field that has great potential in producing petroleum, with 25 workover and 2 infill wells. The scheme released to compare with the PSC Cost Recovery scheme is the Gross Split PSC scheme. The previous scheme was considered to be ineffective and still detrimental to the government. So the government issued Ministerial Regulation No. 52 of 2017 which is the result of a revision of Permen no. 8 of 2017. Gross Split PSC Scheme, the contractor bears all operational costs for the development of oil and gas fields. The economic research on the IYP field aims to compare the Cost Recovery PSC scheme with the Gross Split PSC.

Petro Jurnal Ilmiah Teknik PerminyakanVol. 13(3)
Universitas Trisakti (ID)
Openalex Percentile: Top 88%
Financial Reporting and Valuation Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.