Reliability Analysis of OCR Relay with ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation

The protection system is an important part of the electricity distribution system. Setting the protection relai is a significant procedure that must be ensured properly, so that the relai can work optimally when it experiences interference. If the disturbance is not cut off by the OCR Relay on the feeder, it could result in the incoming tripping, effecting in losses to PLN. Analysis is carried out to determine the reliability of the over current relai (OCR) so that the electric power system remains stable. The relay used by the Cawang Lama Substation is Standard Inverse, where the greater the fault current, the faster the relay working time and vice versa. In this research, simulations were carried out using ETAP 19.0.1, testing and calculations. ETAP simulation shows that protection coordination is appropriate. The relai on the feeder trips first with a time setting of 0.15 s for over current (OC) and 0.2 s for moment over current (MOC), then at incoming 0.24 s for OC and 0.5 s for MOC. The results obtained from the analysis of relay working time on the Bemo feeder up to the power breaker trip (PMT), namely 0.256 s using calculations, 0.275 s using Current Injector, and 0.260 s using ETAP simulation. From a comparison of the working time of the relay, it’s obtained between 0.04 s - 0.019 s, and this value is still considered proper

Authors

Institutions

Publication Details

Journal
JTEIN Jurnal Teknik Elektro Indonesia
Published
2025-02-13
DOI
https://doi.org/10.24036/jtein.v6i1.740
Primary Topic
Thermal Analysis in Power Transmission
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reliability Analysis of OCR Relay with ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation

Lukman Aditya, Eriawan Eriawan, Abdul Kodir Albahar
1 links
JTEIN Jurnal Teknik Elektro Indonesia
Thermal Analysis in Power Transmission
article

Reliability Analysis of OCR Relay with ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation

Lukman Aditya, Eriawan Eriawan, Abdul Kodir Albahar
article en

Abstract

The protection system is an important part of the electricity distribution system. Setting the protection relai is a significant procedure that must be ensured properly, so that the relai can work optimally when it experiences interference. If the disturbance is not cut off by the OCR Relay on the feeder, it could result in the incoming tripping, effecting in losses to PLN. Analysis is carried out to determine the reliability of the over current relai (OCR) so that the electric power system remains stable. The relay used by the Cawang Lama Substation is Standard Inverse, where the greater the fault current, the faster the relay working time and vice versa. In this research, simulations were carried out using ETAP 19.0.1, testing and calculations. ETAP simulation shows that protection coordination is appropriate. The relai on the feeder trips first with a time setting of 0.15 s for over current (OC) and 0.2 s for moment over current (MOC), then at incoming 0.24 s for OC and 0.5 s for MOC. The results obtained from the analysis of relay working time on the Bemo feeder up to the power breaker trip (PMT), namely 0.256 s using calculations, 0.275 s using Current Injector, and 0.260 s using ETAP simulation. From a comparison of the working time of the relay, it’s obtained between 0.04 s - 0.019 s, and this value is still considered proper

JTEIN Jurnal Teknik Elektro IndonesiaVol. 6(1)
Universitas Krisnadwipayana (ID)
Openalex Percentile: Top 91%
Thermal Analysis in Power Transmission
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Reliability Analysis of OCR Relay with ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation — Lukman Aditya, Eriawan Eriawan, et al. · JTEIN Jurnal Teknik Elektro Indonesia (2025) | TGRS Research Map | TGRS