Analytical Hierarchy Process (AHP) based Safety Climate Maturity Model for building construction projects in Tanzania

Tanzania's construction boom, while promising, casts a long shadow with its persistent safety challenges. Addressing these concerns requires not just reactive measures, but a proactive approach to cultivating a safety-mature construction environment. This research delves into this crucial aspect, proposing an Analytical Hierarchy Process (AHP)-based safety maturity model specifically tailored to Tanzanian building projects. MS Excel was used to create an Analytical Hierarchy Process by eight Safety and Health experts who tested the approach after the Smart PLS was used to identify important variables using factor reduction. Out of the 143 variables in the questionnaire, 19 factors were identified as essential factors to be used in this study using the Exploratory Factor Analysis (EFA). The general safety climate index (SCI) of 2.60 of the construction projects was determined. It indicated that the safety climate maturity of construction projects is in a compliant level because the range of SCI is within 2-3 (Level 3) indicating the safety climate processes and procedures are formal and defined. This research aspires to be a roadmap and guiding stakeholders towards safer construction sites, a thriving industry, and a brighter future where human well-being and project success go hand in hand.

Authors

Institutions

Publication Details

Journal
Tanzania Journal of Science
Published
2025-04-14
DOI
https://doi.org/10.4314/tjs.v51i1.3
Citations
1
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
1.54
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analytical Hierarchy Process (AHP) based Safety Climate Maturity Model for building construction projects in Tanzania

F. Mohammed, Juma M. Matindana, Kamugisha J Kajumuloa
1 citations
Tanzania Journal of Science
Occupational Health and Safety Research
1.54
article

Analytical Hierarchy Process (AHP) based Safety Climate Maturity Model for building construction projects in Tanzania

F. Mohammed, Juma M. Matindana, Kamugisha J Kajumuloa
article en
1 citations

Abstract

Tanzania's construction boom, while promising, casts a long shadow with its persistent safety challenges. Addressing these concerns requires not just reactive measures, but a proactive approach to cultivating a safety-mature construction environment. This research delves into this crucial aspect, proposing an Analytical Hierarchy Process (AHP)-based safety maturity model specifically tailored to Tanzanian building projects. MS Excel was used to create an Analytical Hierarchy Process by eight Safety and Health experts who tested the approach after the Smart PLS was used to identify important variables using factor reduction. Out of the 143 variables in the questionnaire, 19 factors were identified as essential factors to be used in this study using the Exploratory Factor Analysis (EFA). The general safety climate index (SCI) of 2.60 of the construction projects was determined. It indicated that the safety climate maturity of construction projects is in a compliant level because the range of SCI is within 2-3 (Level 3) indicating the safety climate processes and procedures are formal and defined. This research aspires to be a roadmap and guiding stakeholders towards safer construction sites, a thriving industry, and a brighter future where human well-being and project success go hand in hand.

Tanzania Journal of ScienceVol. 51(1)
University of Dar es Salaam (TZ)
Openalex Percentile: Top 20%
Occupational Health and Safety Research
1.54
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.