Measuring the Performance of David Ackah as the Construction Project Management Training Consultant Organized by the Institute of Project Management Professionals Ghana

The effectiveness of training consultants plays a crucial role in enhancing professional development in the construction industry, where project management skills are essential for successful project execution. This study evaluates the performance of Prof. David Ackah as a training consultant in construction project management training programs organised by the Institute of Project Management Professionals (IPMP) Ghana. Using a mixed-methods research approach, the study employed daily performance assessments, participant feedback surveys, interviews, and document analysis to measure key aspects of training delivery, including content organisation, engagement, methodology, and overall effectiveness. The findings indicate that Prof. Ackah’s training sessions were well-received, with high ratings for clarity of explanations, depth of technical knowledge, participant engagement, and professionalism. However, areas for improvement were identified, including enhancing interactive learning methods, optimising time management, and increasing the accessibility of training materials. The study underscores the importance of developing a structured framework for evaluating training consultants to ensure continuous improvement in training quality. This research contributes to the broader discourse on effective professional training in Ghana’s construction sector by providing a replicable model for assessing consultant performance. The recommendations emphasise the need for more practical learning approaches, better time management, and the integration of advanced visual learning tools to further enhance the impact of construction project management training.

Authors

Institutions

Publication Details

Journal
IPMP Journal of Management Science.
Published
2025-04-14
DOI
https://doi.org/10.4314/pmsj.v8i2.3
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Measuring the Performance of David Ackah as the Construction Project Management Training Consultant Organized by the Institute of Project Management Professionals Ghana

David Ackah
IPMP Journal of Management Science.
Construction Project Management and Performance
article

Measuring the Performance of David Ackah as the Construction Project Management Training Consultant Organized by the Institute of Project Management Professionals Ghana

David Ackah
article en

Abstract

The effectiveness of training consultants plays a crucial role in enhancing professional development in the construction industry, where project management skills are essential for successful project execution. This study evaluates the performance of Prof. David Ackah as a training consultant in construction project management training programs organised by the Institute of Project Management Professionals (IPMP) Ghana. Using a mixed-methods research approach, the study employed daily performance assessments, participant feedback surveys, interviews, and document analysis to measure key aspects of training delivery, including content organisation, engagement, methodology, and overall effectiveness. The findings indicate that Prof. Ackah’s training sessions were well-received, with high ratings for clarity of explanations, depth of technical knowledge, participant engagement, and professionalism. However, areas for improvement were identified, including enhancing interactive learning methods, optimising time management, and increasing the accessibility of training materials. The study underscores the importance of developing a structured framework for evaluating training consultants to ensure continuous improvement in training quality. This research contributes to the broader discourse on effective professional training in Ghana’s construction sector by providing a replicable model for assessing consultant performance. The recommendations emphasise the need for more practical learning approaches, better time management, and the integration of advanced visual learning tools to further enhance the impact of construction project management training.

IPMP Journal of Management Science.Vol. 8(2)
Knutsford and District Community Hospital (GB)
Openalex Percentile: Top 90%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.