Cost Breakeven Point of Offshore Wind Energy in Brazil

Brazil has abundant natural resources and a largely renewable electricity matrix, with about 90% of its capacity from clean sources. Despite strong offshore wind potential, its economic viability remains uncertain due to the lack of a domestic supply chain and reliance on international cost estimates. This study assesses offshore wind competitiveness in Brazil using the investment decision model (IDM), which minimizes expansion and operational costs through 2031. Capacity factors (CF) from ERA5 data support monthly energy production estimates across load levels. Three scenarios were analyzed: (i) a reference case based on Brazil’s 10-Year Energy Plan (PDE 2031); (ii) mandatory addition of 500 MW/year of offshore wind to assess cost impact; and (iii) a breakeven case with gradual CAPEX and OPEX reductions until offshore wind became cost-competitive. The results indicate that offshore wind energy can become economically viable with a CAPEX range of approximately USD 1500–1550/kW and an OPEX of USD 50–55/kW·year in locations with a CF above 60%. These cost levels have already been observed in global markets and may be achievable in Brazil. However, challenges, such as the lack of a domestic supply chain and volatility in the exchange rate, remain significant barriers.

Authors

Institutions

Publication Details

Journal
Energies
Published
2025-04-25
DOI
https://doi.org/10.3390/en18092198
Citations
1
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
1.15
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Breakeven Point of Offshore Wind Energy in Brazil

Milad Shadman, Stephany Caroline Menezes da Silva, Rafael Lima Guimarães, Amaro Olímpio Pereira et al.
1 citations
Energies
Marine and Offshore Engineering Studies
1.15
article

Cost Breakeven Point of Offshore Wind Energy in Brazil

Milad Shadman, Stephany Caroline Menezes da Silva, Rafael Lima Guimarães, Amaro Olímpio Pereira, Segen F. Estefen, Maurı́cio Tiomno Tolmasquim
article en
1 citations

Abstract

Brazil has abundant natural resources and a largely renewable electricity matrix, with about 90% of its capacity from clean sources. Despite strong offshore wind potential, its economic viability remains uncertain due to the lack of a domestic supply chain and reliance on international cost estimates. This study assesses offshore wind competitiveness in Brazil using the investment decision model (IDM), which minimizes expansion and operational costs through 2031. Capacity factors (CF) from ERA5 data support monthly energy production estimates across load levels. Three scenarios were analyzed: (i) a reference case based on Brazil’s 10-Year Energy Plan (PDE 2031); (ii) mandatory addition of 500 MW/year of offshore wind to assess cost impact; and (iii) a breakeven case with gradual CAPEX and OPEX reductions until offshore wind became cost-competitive. The results indicate that offshore wind energy can become economically viable with a CAPEX range of approximately USD 1500–1550/kW and an OPEX of USD 50–55/kW·year in locations with a CF above 60%. These cost levels have already been observed in global markets and may be achievable in Brazil. However, challenges, such as the lack of a domestic supply chain and volatility in the exchange rate, remain significant barriers.

EnergiesVol. 18(9)
Universidade Federal do Rio de Janeiro (BR)
Openalex Percentile: Top 24%
Marine and Offshore Engineering Studies
1.15
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.