Research on Typical Market Mode of Regulating Hydropower Stations Participating in Spot Market
As the second largest power source in the world, hydropower plays a crucial role in the operation of power systems. This paper focuses on the key issues of regulating hydropower stations participating in the spot market. It aims at the core challenges, such as the conflict of cascade hydro plants’ joint clearing, the lack of adaptability for different types of power supply bidding on the same platform, and the contradiction between long-term operation and the spot market. Through the construction of a water spillage management strategy and settlement compensation mechanism, the competitive abandoned water problem caused by mismatched quotations of cascade hydro plants can be solved. In order to achieve reasonable recovery of the power cost, a separate bidding mechanism and capacity cost recovery model are designed. Subsequently, the sufficient electricity supply constraint of the remaining period is integrated into the spot-clearing model, which can coordinate short-term hydropower dispatch with long-term energy storage demand. The operation of the Yunnan electricity spot market is being simulated to verify the effectiveness of the proposed method.
Authors
- Huaxiang Cai (ORCID: https://orcid.org/0000-0003-0966-2150)
- Yanhe Xu (ORCID: https://orcid.org/0000-0002-1107-6401)
- Dianning Wu
- Xiangrui Liu (ORCID: https://orcid.org/0000-0003-4960-5847)
- Mengfei Xie
Institutions
- Huazhong University of Science and Technology (CN)
Publication Details
- Journal
- Water
- Published
- 2025-04-25
- DOI
- https://doi.org/10.3390/w17091288
- Citations
- 1
- Primary Topic
- Smart Grid and Power Systems
- Type
- article
- Field-Weighted Citation Impact
- 0.73