Differences in Risk Analysis between Workers and Managers: Study from the Perspective of Neuroscience

In the realm of construction safety, disparities in risk perception among workers and frontline managers impede risk communication and undermine risk management endeavors. Building upon previous research, this study zeroes in on a pivotal aspect of risk perception: risk analysis. We executed a behavioral experiment to validate the presence of discrepancies in risk analysis between workers and managers. Event-related potential (ERP) experiments were undertaken to delve into the neural underpinnings of these discrepancies. The results revealed that workers displayed a pronounced bias, extended reaction times, and diminished accuracy rates in both probability and damage judgments, in comparison with managers. Furthermore, the ERP experiment findings suggested notable differences in brain information processing regarding risk analysis between the two groups. In the probability judgment task, workers exhibited higher average amplitudes of N100 and N130, but lower P100 amplitudes than managers. During the damage judgment task, workers showed greater N130 amplitudes and reduced P100 and late positive potential (LPP) amplitudes compared with managers. These results indicated that managers allocated more attentional resources and maintained a broader attention scope during the early attention stage, whereas in the subsequent cognitive stage, they experienced stronger emotional responses and employed more cognitive resources than workers. Moreover, a risk analysis distinction model was developed to discern between the worker and manager cohorts. Employing ERP technology in this investigation enhances our comprehension of the neural mechanisms contributing to risk analysis differences and broadens the scope of related research. This study uncovers the underlying cognitive neuroscientific reasons for the observed differences in risk analysis between workers and managers. The results provide essential references for the scientific development of safety training programs by focusing on three key areas: attention allocation, emotional arousal, and distribution of cognitive resources. Additionally, it furnishes recommendations for the establishment of improved risk communication strategies between managers and workers.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-04-26
DOI
https://doi.org/10.1061/jcemd4.coeng-14867
Citations
1
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
1.54
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Differences in Risk Analysis between Workers and Managers: Study from the Perspective of Neuroscience

Xinyu Hua, Zhang Shu, Yan Zhang, Xiuzhi Shi
1 citations
Journal of Construction Engineering and Management
Occupational Health and Safety Research
1.54
article

Differences in Risk Analysis between Workers and Managers: Study from the Perspective of Neuroscience

Xinyu Hua, Zhang Shu, Yan Zhang, Xiuzhi Shi
article en
1 citations

Abstract

In the realm of construction safety, disparities in risk perception among workers and frontline managers impede risk communication and undermine risk management endeavors. Building upon previous research, this study zeroes in on a pivotal aspect of risk perception: risk analysis. We executed a behavioral experiment to validate the presence of discrepancies in risk analysis between workers and managers. Event-related potential (ERP) experiments were undertaken to delve into the neural underpinnings of these discrepancies. The results revealed that workers displayed a pronounced bias, extended reaction times, and diminished accuracy rates in both probability and damage judgments, in comparison with managers. Furthermore, the ERP experiment findings suggested notable differences in brain information processing regarding risk analysis between the two groups. In the probability judgment task, workers exhibited higher average amplitudes of N100 and N130, but lower P100 amplitudes than managers. During the damage judgment task, workers showed greater N130 amplitudes and reduced P100 and late positive potential (LPP) amplitudes compared with managers. These results indicated that managers allocated more attentional resources and maintained a broader attention scope during the early attention stage, whereas in the subsequent cognitive stage, they experienced stronger emotional responses and employed more cognitive resources than workers. Moreover, a risk analysis distinction model was developed to discern between the worker and manager cohorts. Employing ERP technology in this investigation enhances our comprehension of the neural mechanisms contributing to risk analysis differences and broadens the scope of related research. This study uncovers the underlying cognitive neuroscientific reasons for the observed differences in risk analysis between workers and managers. The results provide essential references for the scientific development of safety training programs by focusing on three key areas: attention allocation, emotional arousal, and distribution of cognitive resources. Additionally, it furnishes recommendations for the establishment of improved risk communication strategies between managers and workers.

Journal of Construction Engineering and ManagementVol. 151(7)
Huazhong University of Science and Technology (CN)
Decent work and economic growth
Openalex Percentile: Top 20%
Occupational Health and Safety Research
1.54
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.