Implementation of Proactive Load Shedding for a Power Management Systems on a Running Offshore Platform

The idea of documenting the performance and operational experiences of a Power Management System (PMS) over a period of at least five years following commissioning is indeed valuable for the industrial electrical power community. This kind of long-term analysis provides insights into the system's reliability, identifies operational challenges that may arise post-installation, and highlights the evolution and enhancements made to the system for improved functionality. The idea behind this paper is to tell the story of how a PMS that integrates Gas Turbine and Steam Turbine at an offshore production facility is highly valuable. This narrative can provide valuable insights into the challenges and successes encountered during commissioning and operation over an extended period. Key aspects to consider for the paper includes: Operational Challenges: Highlight any unknown operational difficulties that emerged post-installation. Discuss how these challenges were identified, analyzed, and addressed to ensure continuous and reliable operation. Updates and Enhancements: Detail the updates and system enhancements implemented over the system's lifetime. Explain the rationale behind these changes, their impact on functionality, and the methods used to ensure continuity of operation during the updates. Improved Operational Matrix: Discuss the tangible benefits and improvements achieved in the operational matrix of the PMS as a result of updates and enhancements. This could include efficiency gains, reduced downtime, or enhanced overall performance. Lessons Learned: Share valuable lessons learned from the entire process, including commissioning, identifying operational difficulties, and implementing updates. Discuss how these lessons informed decision-making for ongoing maintenance and future projects.

Authors

Institutions

Publication Details

Published
2025-03-22
DOI
https://doi.org/10.1109/southeastcon56624.2025.10971637
Primary Topic
Engineering Applied Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementation of Proactive Load Shedding for a Power Management Systems on a Running Offshore Platform

M. C. Madhu, Rodrigo Munoz
Engineering Applied Research
article

Implementation of Proactive Load Shedding for a Power Management Systems on a Running Offshore Platform

M. C. Madhu, Rodrigo Munoz
article en

Abstract

The idea of documenting the performance and operational experiences of a Power Management System (PMS) over a period of at least five years following commissioning is indeed valuable for the industrial electrical power community. This kind of long-term analysis provides insights into the system's reliability, identifies operational challenges that may arise post-installation, and highlights the evolution and enhancements made to the system for improved functionality. The idea behind this paper is to tell the story of how a PMS that integrates Gas Turbine and Steam Turbine at an offshore production facility is highly valuable. This narrative can provide valuable insights into the challenges and successes encountered during commissioning and operation over an extended period. Key aspects to consider for the paper includes: Operational Challenges: Highlight any unknown operational difficulties that emerged post-installation. Discuss how these challenges were identified, analyzed, and addressed to ensure continuous and reliable operation. Updates and Enhancements: Detail the updates and system enhancements implemented over the system's lifetime. Explain the rationale behind these changes, their impact on functionality, and the methods used to ensure continuity of operation during the updates. Improved Operational Matrix: Discuss the tangible benefits and improvements achieved in the operational matrix of the PMS as a result of updates and enhancements. This could include efficiency gains, reduced downtime, or enhanced overall performance. Lessons Learned: Share valuable lessons learned from the entire process, including commissioning, identifying operational difficulties, and implementing updates. Discuss how these lessons informed decision-making for ongoing maintenance and future projects.

Siemens (United States) (US)
Affordable and clean energy
Openalex Percentile: Top 91%
Engineering Applied Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.