A Comparison of Return Periods of Design Ground Motions for Dams from Different Agencies and Organizations

The purpose of this paper is to review and compare the criteria of seismic design ground motions and approaches in seismic hazard analysis set forth by various agencies and organizations. A total of 13 agencies and organizations were reviewed including three for non-dam structures. It was found the both the deterministic and probabilistic seismic hazard analysis approaches have been used. Many have combined the two approaches to complement each other. High-consequence dams are designed for a long ground motion return period of approximately 10,000 years, which lies between the design return periods of bridges and nuclear power plants. In contrast to other agencies and organizations, U.S. Bureau of Reclamation dams are not subjected to specific design return periods; they are designed based on risk-informed decisions, which consider the failure probability in relation to the public protection guideline values. In addition, criteria from the Reclamation Design Standards are to be followed in any dam modifications. Based on the findings of this paper, it was deemed that the current Reclamation dam safety decisions and practices are in general agreement with other dam agencies and organizations that also adopt the risk-informed decision process.

Authors

Institutions

Publication Details

Journal
Infrastructures
Published
2025-04-24
DOI
https://doi.org/10.3390/infrastructures10050105
Citations
1
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.95
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Comparison of Return Periods of Design Ground Motions for Dams from Different Agencies and Organizations

A. Gutierrez, Kevin Zeh-Zon Lee, David Rees Gillette
1 citations
Infrastructures
Dam Engineering and Safety
0.95
article

A Comparison of Return Periods of Design Ground Motions for Dams from Different Agencies and Organizations

A. Gutierrez, Kevin Zeh-Zon Lee, David Rees Gillette
article en
1 citations

Abstract

The purpose of this paper is to review and compare the criteria of seismic design ground motions and approaches in seismic hazard analysis set forth by various agencies and organizations. A total of 13 agencies and organizations were reviewed including three for non-dam structures. It was found the both the deterministic and probabilistic seismic hazard analysis approaches have been used. Many have combined the two approaches to complement each other. High-consequence dams are designed for a long ground motion return period of approximately 10,000 years, which lies between the design return periods of bridges and nuclear power plants. In contrast to other agencies and organizations, U.S. Bureau of Reclamation dams are not subjected to specific design return periods; they are designed based on risk-informed decisions, which consider the failure probability in relation to the public protection guideline values. In addition, criteria from the Reclamation Design Standards are to be followed in any dam modifications. Based on the findings of this paper, it was deemed that the current Reclamation dam safety decisions and practices are in general agreement with other dam agencies and organizations that also adopt the risk-informed decision process.

InfrastructuresVol. 10(5)
United States Department of the Interior (US)
Openalex Percentile: Top 27%
Dam Engineering and Safety
0.95
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.