Evaluation of mismatch power loss in a PV string composed of series-connected modules: Theory versus experiment
Ground-installed PV power-systems are usually built in parallel-rows; each is composed of series-connected modules. With time, some modules got-polluted or −shaded differently. On damage, some modules may be replaced by others of different ratings. This creates mismatch among the series-connected modules accompanied by loss of output power. This motivates the authors to extend their earlier proposed three-stage methodology for calculating the I-V and P-V curves to evaluate the mismatch power loss. The studied mismatches are due to series-connected dusty and clean modules, modules with different ratings, and modules with a half-cell shading in one of the modules. The proposed three-stage methodology is based on solution of Lambert-function in three-steps. The calculated current–voltage and power-voltage curves as well as highest output power by proposed methodology are validated by experimental results for the investigated mismatch conditions. The percentage mismatch power-loss recorded values of 5.4 %, 12.11 %, and 17.9 %.
Authors
- Reham Kamal (ORCID: https://orcid.org/0000-0002-9005-5085)
- Mazen Abdel‐Salam
- Mohamed Nayel (ORCID: https://orcid.org/0000-0002-1691-3352)
Institutions
- Assiut University (EG)
Publication Details
- Journal
- Ain Shams Engineering Journal
- Published
- 2025-04-24
- DOI
- https://doi.org/10.1016/j.asej.2025.103422
- Citations
- 1
- Primary Topic
- Photovoltaic System Optimization Techniques
- Type
- article
- Field-Weighted Citation Impact
- 0.36
Funders
- Science and Technology Development Fund
- Assiut University