Debunking the speed-fidelity trade-off: Speeding-up large-scale energy models while keeping fidelity

Energy system models are essential for planning and supporting the energy transition. However, increasing temporal, spatial, and sectoral resolutions have led to large-scale linear programming (LP) models that are often (over)simplified to remain computationally tractable—frequently at the expense of model fidelity. This paper challenges the common belief that LP formulations cannot be improved without sacrificing their accuracy. Inspired by graph theory, we propose to model energy systems using energy assets (vertices), as a single building-block, and flows to connect between them. This reduces the need for additional components such as nodes and connections. The resulting formulation is more compact, without sacrificing accuracy, and leverages the inherent graph structure of energy systems. To evaluate performance, we implemented and compared four common modelling approaches varying in their use of building blocks and flow representations. We conducted experiments using TulipaEnergyModel.jl and applied them to a multi-sector case study with varying problem sizes. Results show that our single-building-block (1BB-1F) approach reduces variables and constraints by 26% and 35%, respectively, and achieves a 1.27x average speedup in solving time without any loss in model fidelity. The speedup increases with problem size, making this approach particularly advantageous for large-scale models. Our findings demonstrate that not all LPs are equal in quality and that better reformulations can lead to substantial computational benefits. This paper also aims to raise awareness of model quality considerations in energy system optimisation and promote more efficient formulations without compromising fidelity. • The proposed single modelling block reduces size, speeding up creation and runtime. • Fewer variables and constraints without losing accuracy in the optimisation models. • Benefits increase with problem size, aiding large-scale energy system modelling. • Enhancing modelling with a more direct and flexible connection between assets.

Authors

Institutions

Publication Details

Journal
International Journal of Electrical Power & Energy Systems
Published
2025-04-24
DOI
https://doi.org/10.1016/j.ijepes.2025.110674
Citations
3
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
2.19
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Debunking the speed-fidelity trade-off: Speeding-up large-scale energy models while keeping fidelity

Germán Morales-España, Diego A. Tejada‐Arango, Juha Kiviluoma
3 citations
International Journal of Electrical Power & Energy Systems
Integrated Energy Systems Optimization
2.19
article

Debunking the speed-fidelity trade-off: Speeding-up large-scale energy models while keeping fidelity

Germán Morales-España, Diego A. Tejada‐Arango, Juha Kiviluoma
article en
3 citations

Abstract

Energy system models are essential for planning and supporting the energy transition. However, increasing temporal, spatial, and sectoral resolutions have led to large-scale linear programming (LP) models that are often (over)simplified to remain computationally tractable—frequently at the expense of model fidelity. This paper challenges the common belief that LP formulations cannot be improved without sacrificing their accuracy. Inspired by graph theory, we propose to model energy systems using energy assets (vertices), as a single building-block, and flows to connect between them. This reduces the need for additional components such as nodes and connections. The resulting formulation is more compact, without sacrificing accuracy, and leverages the inherent graph structure of energy systems. To evaluate performance, we implemented and compared four common modelling approaches varying in their use of building blocks and flow representations. We conducted experiments using TulipaEnergyModel.jl and applied them to a multi-sector case study with varying problem sizes. Results show that our single-building-block (1BB-1F) approach reduces variables and constraints by 26% and 35%, respectively, and achieves a 1.27x average speedup in solving time without any loss in model fidelity. The speedup increases with problem size, making this approach particularly advantageous for large-scale models. Our findings demonstrate that not all LPs are equal in quality and that better reformulations can lead to substantial computational benefits. This paper also aims to raise awareness of model quality considerations in energy system optimisation and promote more efficient formulations without compromising fidelity. • The proposed single modelling block reduces size, speeding up creation and runtime. • Fewer variables and constraints without losing accuracy in the optimisation models. • Benefits increase with problem size, aiding large-scale energy system modelling. • Enhancing modelling with a more direct and flexible connection between assets.

International Journal of Electrical Power & Energy SystemsVol. 168
Netherlands Organisation for Applied Scientific Research (NL), Töölö Hospital (FI), VTT Technical Research Centre of Finland (FI), Universidad Pontificia Comillas (ES), Delft University of Technology (NL)
Affordable and clean energy
Openalex Percentile: Top 13%
Integrated Energy Systems Optimization
2.19
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.