The Innovation Process of Utilizing Renewable Energy Sources for Sustainable Heat Production

The long-term rise in energy prices leads to reduced consumption, negatively impacting the efficiency of centralized heat supply systems (CHSS). As a result, it is necessary to address the economically inefficient preparation of hot water (HW) at heat transfer stations (HTS). Within the framework of the “Integrated National Energy and Climate Plan” (NECP), which is valid from 2021 to 2030, the industrial sector is aiming to produce 25% of its electricity from renewable energy sources (RES) by 2030. This target, up from 19.2% in 2018, equates to a value of 27.3%, which is at the technical limit of the Slovak electricity system. This article aims to study the installation of PV panels for domestic hot water (DHW) preparation within the central heat supply system (HTS) process, with the decision depending on the results of an economic return analysis. The estimated investment of EUR 5000 excluding VAT would generate annual savings of EUR 311, resulting in a payback period of approximately 16 years. The main limitation is the low efficiency in winter and no production at night, while in summer, a surplus of electricity can be used for preheating cold water.

Authors

Institutions

Publication Details

Journal
Processes
Published
2025-04-24
DOI
https://doi.org/10.3390/pr13051301
Primary Topic
Solar Thermal and Photovoltaic Systems
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Innovation Process of Utilizing Renewable Energy Sources for Sustainable Heat Production

Miriam Pekarčíková, Martina Laubertová, Marcela Malindžáková
1 links
Processes
Solar Thermal and Photovoltaic Systems
article

The Innovation Process of Utilizing Renewable Energy Sources for Sustainable Heat Production

Miriam Pekarčíková, Martina Laubertová, Marcela Malindžáková
article en

Abstract

The long-term rise in energy prices leads to reduced consumption, negatively impacting the efficiency of centralized heat supply systems (CHSS). As a result, it is necessary to address the economically inefficient preparation of hot water (HW) at heat transfer stations (HTS). Within the framework of the “Integrated National Energy and Climate Plan” (NECP), which is valid from 2021 to 2030, the industrial sector is aiming to produce 25% of its electricity from renewable energy sources (RES) by 2030. This target, up from 19.2% in 2018, equates to a value of 27.3%, which is at the technical limit of the Slovak electricity system. This article aims to study the installation of PV panels for domestic hot water (DHW) preparation within the central heat supply system (HTS) process, with the decision depending on the results of an economic return analysis. The estimated investment of EUR 5000 excluding VAT would generate annual savings of EUR 311, resulting in a payback period of approximately 16 years. The main limitation is the low efficiency in winter and no production at night, while in summer, a surplus of electricity can be used for preheating cold water.

ProcessesVol. 13(5)
Technical University of Košice (SK)
Agentúra na Podporu Výskumu a Vývoja, Kultúrna a Edukacná Grantová Agentúra MŠVVaŠ SR
Openalex Percentile: Top 95%
Solar Thermal and Photovoltaic Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.