An Improved Seagull Optimization Algorithm for Multi-Center Maintenance Task Allocation of UAV Swarm Under Resource Constraints

This paper addresses the optimization problem of maintenance and support task allocation and scheduling for unmanned aerial vehicle (UA V) swarms when performing multi - batch continuous sortie missions. Against the backdrop of multiple maintenance centers, multiple maintenance personnel, and multiple equipment spare parts, a maintenance and support task allocation method based on the improved seagull optimization algorithm is studied. Under the condition of limited maintenance resources, this algorithm aims to minimize the batch sortie preparation time, optimize the workload balance of maintenance personnel, and minimize the total maintenance and support time of the UA V swarm. By introducing chaos mapping, non - linear additional variables, greedy insertion, Levy flight, and random multi - point exchange strategies into the seagull optimization algorithm, the optimization of the maintenance and support task allocation scheme is achieved. Through experiments with background case data, compared with traditional algorithms, the improved seagull algorithm proposed in this paper has significantly improved in optimization indicators such as the sortie time of the next task, task balance, and total maintenance and support time.

Authors

Institutions

Publication Details

Published
2025-03-14
DOI
https://doi.org/10.1109/itoec63606.2025.10967898
Citations
1
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Improved Seagull Optimization Algorithm for Multi-Center Maintenance Task Allocation of UAV Swarm Under Resource Constraints

Huan Wang, Liang Xia, Qidong Huang, Bin Zhang
1 citations
Advanced Manufacturing and Logistics Optimization
1.24
article

An Improved Seagull Optimization Algorithm for Multi-Center Maintenance Task Allocation of UAV Swarm Under Resource Constraints

Huan Wang, Liang Xia, Qidong Huang, Bin Zhang
article en
1 citations

Abstract

This paper addresses the optimization problem of maintenance and support task allocation and scheduling for unmanned aerial vehicle (UA V) swarms when performing multi - batch continuous sortie missions. Against the backdrop of multiple maintenance centers, multiple maintenance personnel, and multiple equipment spare parts, a maintenance and support task allocation method based on the improved seagull optimization algorithm is studied. Under the condition of limited maintenance resources, this algorithm aims to minimize the batch sortie preparation time, optimize the workload balance of maintenance personnel, and minimize the total maintenance and support time of the UA V swarm. By introducing chaos mapping, non - linear additional variables, greedy insertion, Levy flight, and random multi - point exchange strategies into the seagull optimization algorithm, the optimization of the maintenance and support task allocation scheme is achieved. Through experiments with background case data, compared with traditional algorithms, the improved seagull algorithm proposed in this paper has significantly improved in optimization indicators such as the sortie time of the next task, task balance, and total maintenance and support time.

Second Artillery General Hospital of Chinese People's Liberation Army (CN)
Openalex Percentile: Top 20%
Advanced Manufacturing and Logistics Optimization
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An Improved Seagull Optimization Algorithm for Multi-Center Maintenance Task Allocation of UAV Swarm Under Resource Constraints — Huan Wang, Liang Xia, et al. · (2025) | TGRS Research Map | TGRS