Advancing multi-objective optimization in resource management using the NSGA-III algorithm
This paper presents a method for applying a more comprehensive approach to the resource-constrained project scheduling problem, considering task start dates and allowing for project time extensions to better ensure cost and resource leveling factors. This study employs an improved version of the non-dominated sorting genetic algorithm III (NSGA-III), developed from the genetic algorithm (GA), to address the multi-objective problem. The research results in a set of Pareto-optimal solutions superior to those obtained in previous studies. Through the integration of NSGA-III, this research contributes to advancing the field of multi-objective optimization in resource-constrained project scheduling, offering promising avenues for future research and practical applications.
Authors
- Vu Hong Son Pham (ORCID: https://orcid.org/0000-0002-9788-0627)
- Ngoc Thao Phuong Hoang (ORCID: https://orcid.org/0009-0004-8810-4206)
Institutions
- Vietnam National University Ho Chi Minh City (VN)
- Ho Chi Minh City University of Technology (VN)
Publication Details
- Journal
- Canadian Journal of Civil Engineering
- Published
- 2025-04-23
- DOI
- https://doi.org/10.1139/cjce-2024-0298
- Citations
- 1
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 1.24