Advancing multi-objective optimization in resource management using the NSGA-III algorithm

This paper presents a method for applying a more comprehensive approach to the resource-constrained project scheduling problem, considering task start dates and allowing for project time extensions to better ensure cost and resource leveling factors. This study employs an improved version of the non-dominated sorting genetic algorithm III (NSGA-III), developed from the genetic algorithm (GA), to address the multi-objective problem. The research results in a set of Pareto-optimal solutions superior to those obtained in previous studies. Through the integration of NSGA-III, this research contributes to advancing the field of multi-objective optimization in resource-constrained project scheduling, offering promising avenues for future research and practical applications.

Authors

Institutions

Publication Details

Journal
Canadian Journal of Civil Engineering
Published
2025-04-23
DOI
https://doi.org/10.1139/cjce-2024-0298
Citations
1
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Advancing multi-objective optimization in resource management using the NSGA-III algorithm

Vu Hong Son Pham, Ngoc Thao Phuong Hoang
1 citations
Canadian Journal of Civil Engineering
Scheduling and Optimization Algorithms
1.24
article

Advancing multi-objective optimization in resource management using the NSGA-III algorithm

Vu Hong Son Pham, Ngoc Thao Phuong Hoang
article en
1 citations

Abstract

This paper presents a method for applying a more comprehensive approach to the resource-constrained project scheduling problem, considering task start dates and allowing for project time extensions to better ensure cost and resource leveling factors. This study employs an improved version of the non-dominated sorting genetic algorithm III (NSGA-III), developed from the genetic algorithm (GA), to address the multi-objective problem. The research results in a set of Pareto-optimal solutions superior to those obtained in previous studies. Through the integration of NSGA-III, this research contributes to advancing the field of multi-objective optimization in resource-constrained project scheduling, offering promising avenues for future research and practical applications.

Canadian Journal of Civil EngineeringVol. 52(7)
Vietnam National University Ho Chi Minh City (VN), Ho Chi Minh City University of Technology (VN)
Openalex Percentile: Top 20%
Scheduling and Optimization Algorithms
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.