PROCESSO CONSTRUTIVO EM DRYWALL-ESTUDO DE CASO: PRÉDIO RESIDENCIAL DE MÚLTIPLOS PAVIMENTOS NA CIDADE DE MANAUS
ABSTRACT The work in question is a case study about the construction system in Drywall structures. The focus is to describe the construction process of this dry system, considering the techniques used and the necessary labor to ensure the correct execution of the installation. It explores its impact on construction time, costs, and sustainability, in addition to investigating the challenges faced in the implementation of this system in the Amazon region. The adopted methodology includes a bibliographic research for theoretical grounding, analyzing the application of drywall. All stages of the process were observed, from site preparation to the final installation of drywall boards, in their standard, moisture-resistant, and fire-resistant versions, up to the final finishing, strictly following technical standards and controlled service manuals. The results demonstrated that drywall can improve the execution time of the project, reduce waste generation, and contribute to more sustainable practices. The study reinforces the importance of adequate planning and specific training to maximize the benefits of this construction technology. Keyword: Drywall, Execution, Construction time.
Authors
- Priscila Gonçalves (ORCID: https://orcid.org/0000-0002-1849-0226)
- Érika Cristina Nogueira Marques Pinheiro
- L. Barbosa (ORCID: https://orcid.org/0000-0001-7010-5228)
Publication Details
- Journal
- Revista fisio&terapia.
- Published
- 2025-04-22
- DOI
- https://doi.org/10.69849/revistaft/dt10202504222315
- Primary Topic
- Recycled Aggregate Concrete Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00