Study on the optimization of duration for repetitive projects considering spatial interference effects in operations

In the field of project duration optimization, a substantial amount of research has already been conducted. Although these studies have made significant contributions to project management, they remain somewhat theoretical. Few researchers have addressed the issue of workspace interference among workers, which is common in construction processes, as a point of entry for optimizing duration. Therefore, we believe that there is room for further improvement in this area of research. This paper focuses on repetitive construction projects, considering the effects of workspace interference during actual construction. Through agent-based modeling, we simulate the construction environment to determine the relationship between crew size and unit duration changes. The findings reveal that agent-based models demonstrate high reliability in simulating worker efficiency. Furthermore, we propose a model for solving optimal duration based on simulation results, using a genetic algorithm, and analyze the calculation results, speed, and complexity of the genetic algorithm with a heuristic approach. The results indicate that the genetic algorithm has advantages in handling duration optimization problems with slightly more than 10 tasks.

Authors

Institutions

Publication Details

Journal
Journal of Asian Architecture and Building Engineering
Published
2025-04-22
DOI
https://doi.org/10.1080/13467581.2025.2489539
Citations
1
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on the optimization of duration for repetitive projects considering spatial interference effects in operations

Peng Duan, Jun Liu, Fan Zhang, S. Yin et al.
1 citations
Journal of Asian Architecture and Building Engineering
Manufacturing Process and Optimization
1.24
article

Study on the optimization of duration for repetitive projects considering spatial interference effects in operations

Peng Duan, Jun Liu, Fan Zhang, S. Yin, Chunli Zhang, Yan Fu
article en
1 citations

Abstract

In the field of project duration optimization, a substantial amount of research has already been conducted. Although these studies have made significant contributions to project management, they remain somewhat theoretical. Few researchers have addressed the issue of workspace interference among workers, which is common in construction processes, as a point of entry for optimizing duration. Therefore, we believe that there is room for further improvement in this area of research. This paper focuses on repetitive construction projects, considering the effects of workspace interference during actual construction. Through agent-based modeling, we simulate the construction environment to determine the relationship between crew size and unit duration changes. The findings reveal that agent-based models demonstrate high reliability in simulating worker efficiency. Furthermore, we propose a model for solving optimal duration based on simulation results, using a genetic algorithm, and analyze the calculation results, speed, and complexity of the genetic algorithm with a heuristic approach. The results indicate that the genetic algorithm has advantages in handling duration optimization problems with slightly more than 10 tasks.

Journal of Asian Architecture and Building Engineering
Chongqing University (CN), Meteorological Bureau of Shenzhen Municipality (CN), China State Construction Engineering (China) (CN), Public Works (GB)
Openalex Percentile: Top 20%
Manufacturing Process and Optimization
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.