Retrofitting to Last: Identifying and Avoiding Retrofitting Errors in Bird Protection Devices

Electrocutions on overhead 6–10 kV electric distribution systems are killing substantial numbers of raptors in Kazakhstan, Russia, and adjacent countries. Electrocutions can also create disruptive electrical faults and outages, damage equipment, and occasionally ignite wildfires. To manage raptor electrocution risks, electric utilities in the region install Bird Protection Devices (BPDs) designed to prevent birds from contacting energized components. When installed correctly, BPDs can be highly effective. When installed incorrectly, however, electrocutions may continue to occur on retrofitted pylons. BPDs deployed beyond their intended service life may also allow electrocutions to resume. We provide examples of correctly and incorrectly installed BPDs to help readers identify five categories of retrofitting errors: product design errors, mitigation plan errors, application errors, improvisation errors, and beyond service life failures. Missteps can be avoided through carefully selecting which BPDs will be used, ensuring all risk points on a pylon are covered with BPDs, training field personnel to install BPDs correctly, ensuring BPDs are available to field personnel, communicating with manufacturers to improve BPD designs when necessary, and replacing BPDs as they approach the end of their intended service life. Electric utilities should also consider environmental stresses that may impact the effectiveness and lifespan of BPDs. The Institute of Electrical and Electronics Engineers (IEEE) recommends a sequence of tests for BPDs to ensure long-term durability, enabling electric utilities to select objectively evaluated high-quality covers. Careful attention to preventing errors and accounting for service life can help electric utilities maximize the conservation and reliability benefits of BPDs.

Authors

Publication Details

Journal
Raptors Conservation
Published
2025-04-17
DOI
https://doi.org/10.19074/1814-8654-2025-50-68-77
Primary Topic
Wildlife Ecology and Conservation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Retrofitting to Last: Identifying and Avoiding Retrofitting Errors in Bird Protection Devices

James F. Dwyer, Richard E. Harness
Raptors Conservation
Wildlife Ecology and Conservation
article

Retrofitting to Last: Identifying and Avoiding Retrofitting Errors in Bird Protection Devices

James F. Dwyer, Richard E. Harness
article en

Abstract

Electrocutions on overhead 6–10 kV electric distribution systems are killing substantial numbers of raptors in Kazakhstan, Russia, and adjacent countries. Electrocutions can also create disruptive electrical faults and outages, damage equipment, and occasionally ignite wildfires. To manage raptor electrocution risks, electric utilities in the region install Bird Protection Devices (BPDs) designed to prevent birds from contacting energized components. When installed correctly, BPDs can be highly effective. When installed incorrectly, however, electrocutions may continue to occur on retrofitted pylons. BPDs deployed beyond their intended service life may also allow electrocutions to resume. We provide examples of correctly and incorrectly installed BPDs to help readers identify five categories of retrofitting errors: product design errors, mitigation plan errors, application errors, improvisation errors, and beyond service life failures. Missteps can be avoided through carefully selecting which BPDs will be used, ensuring all risk points on a pylon are covered with BPDs, training field personnel to install BPDs correctly, ensuring BPDs are available to field personnel, communicating with manufacturers to improve BPD designs when necessary, and replacing BPDs as they approach the end of their intended service life. Electric utilities should also consider environmental stresses that may impact the effectiveness and lifespan of BPDs. The Institute of Electrical and Electronics Engineers (IEEE) recommends a sequence of tests for BPDs to ensure long-term durability, enabling electric utilities to select objectively evaluated high-quality covers. Careful attention to preventing errors and accounting for service life can help electric utilities maximize the conservation and reliability benefits of BPDs.

Raptors Conservation(50)
Openalex Percentile: Top 92%
Wildlife Ecology and Conservation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.