Leveraging BIM for Proactive Dispute Avoidance in Construction Projects

The construction industry faces persistent challenges from disputes and claims, leading to delays, cost overruns, and strained stakeholder relationships. This study proposes a strategic framework that integrates building information modeling (BIM) as a proactive tool for dispute avoidance. Using a causal loop diagram (CLD), the research maps the relationships among systemic factors contributing to disputes, such as poor communication, ambiguous specifications, and ineffective stakeholder engagement. The study highlights BIM’s transformative potential in enhancing visualization, improving collaboration, and fostering proactive conflict resolution. Validated through expert insights, the framework provides actionable recommendations for integrating BIM (with ISO19650 specs) into construction workflows, addressing the root causes of disputes, and driving project efficiency. This research contributes a structured roadmap for advancing construction management practices, emphasizing early BIM adoption considered with ISO19650, stakeholder alignment, and balancing systemic dynamics. The findings underscore BIM’s pivotal role in reshaping conflict prevention strategies, paving the way for sustainable and dispute-free project delivery.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-04-22
DOI
https://doi.org/10.3390/buildings15091401
Citations
3
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
3.02
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Leveraging BIM for Proactive Dispute Avoidance in Construction Projects

Nagi N. Mansour, Ahmed Ehab, Mohamed Tantawy, Samar M. Nour et al.
3 citations
Buildings
BIM and Construction Integration
3.02
article

Leveraging BIM for Proactive Dispute Avoidance in Construction Projects

Nagi N. Mansour, Ahmed Ehab, Mohamed Tantawy, Samar M. Nour, Mohamed M. Kosbar
article en
3 citations

Abstract

The construction industry faces persistent challenges from disputes and claims, leading to delays, cost overruns, and strained stakeholder relationships. This study proposes a strategic framework that integrates building information modeling (BIM) as a proactive tool for dispute avoidance. Using a causal loop diagram (CLD), the research maps the relationships among systemic factors contributing to disputes, such as poor communication, ambiguous specifications, and ineffective stakeholder engagement. The study highlights BIM’s transformative potential in enhancing visualization, improving collaboration, and fostering proactive conflict resolution. Validated through expert insights, the framework provides actionable recommendations for integrating BIM (with ISO19650 specs) into construction workflows, addressing the root causes of disputes, and driving project efficiency. This research contributes a structured roadmap for advancing construction management practices, emphasizing early BIM adoption considered with ISO19650, stakeholder alignment, and balancing systemic dynamics. The findings underscore BIM’s pivotal role in reshaping conflict prevention strategies, paving the way for sustainable and dispute-free project delivery.

BuildingsVol. 15(9)
Badr University in Cairo (EG), Arab Academy for Science, Technology, and Maritime Transport (EG), Helwan University (EG)
Openalex Percentile: Top 10%
BIM and Construction Integration
3.02
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.