A Synchronization of Permanent Magnet Synchronous Generator Dedicated for Small and Medium Hydroelectric Plants

This article presents the simulation results of synchronization of a permanent magnet synchronous generator (PMSG) dedicated for a hydroelectric plant without power converter devices. The proposed machine design allows to connect a generator to the grid in two different ways. With the first method, the machine is connected to the grid in a similar way as in the case of an electrically excited synchronous generator. The second method is a direct line-start process based on asynchronous torque—similar to asynchronous motor start. Both methods can be used alternately. The advantages of the presented design are elimination of converter devices for starting the PMSG, possibility of use in small and medium hydroelectric power plants, operation with a high efficiency and high power factor in a wide range of generated power, and smaller dimensions in comparison to the generators currently used. The described rotor design allows for the elimination of capacitor batteries for compensation of reactive power drawn by induction generators commonly used in small hydroelectric plants. In addition, due to the high efficiency of the PMSG, high power factor, and appropriately selected design, the starting current during synchronization is smaller than in the case of an induction generator, which means that the structural elements wear out more slowly, and thus, the generator’s service life is increased. In this work, it is shown that PMSG with a rotor cage should have permanent magnets with an increased temperature class in order to avoid demagnetization of the magnets during asynchronous start-up. In addition, manufacturers of such generators should provide the number of start-up cycles from cold and warm states in order to avoid shortening the service life of the machine. The main objective of the article is to present the methods of synchronizing a generator of such a design (a rotor with permanent magnets and a starting cage) and their consequences on the behavior of the machine. The presented design allows synchronization of the generator with the network in two ways. The first method enables synchronization of the generator with the power system by asynchronous start-up, i.e., obtaining a starting torque exceeding the braking torque from the magnets. The second method of synchronization is similar to the method used in electromagnetically excited generators, i.e., before connecting, the rotor is accelerated to synchronous speed by means of a water turbine, and then, the machine is connected to the grid by switching on the circuit breaker. This paper presents electromagnetic phenomena occurring in both cases of synchronization and describes the influence of magnet temperature on physical quantities.

Authors

Institutions

Publication Details

Journal
Energies
Published
2025-04-21
DOI
https://doi.org/10.3390/en18082128
Primary Topic
Electric Motor Design and Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Synchronization of Permanent Magnet Synchronous Generator Dedicated for Small and Medium Hydroelectric Plants

A. Gozdowiak, Maciej Antal
Energies
Electric Motor Design and Analysis
article

A Synchronization of Permanent Magnet Synchronous Generator Dedicated for Small and Medium Hydroelectric Plants

A. Gozdowiak, Maciej Antal
article en

Abstract

This article presents the simulation results of synchronization of a permanent magnet synchronous generator (PMSG) dedicated for a hydroelectric plant without power converter devices. The proposed machine design allows to connect a generator to the grid in two different ways. With the first method, the machine is connected to the grid in a similar way as in the case of an electrically excited synchronous generator. The second method is a direct line-start process based on asynchronous torque—similar to asynchronous motor start. Both methods can be used alternately. The advantages of the presented design are elimination of converter devices for starting the PMSG, possibility of use in small and medium hydroelectric power plants, operation with a high efficiency and high power factor in a wide range of generated power, and smaller dimensions in comparison to the generators currently used. The described rotor design allows for the elimination of capacitor batteries for compensation of reactive power drawn by induction generators commonly used in small hydroelectric plants. In addition, due to the high efficiency of the PMSG, high power factor, and appropriately selected design, the starting current during synchronization is smaller than in the case of an induction generator, which means that the structural elements wear out more slowly, and thus, the generator’s service life is increased. In this work, it is shown that PMSG with a rotor cage should have permanent magnets with an increased temperature class in order to avoid demagnetization of the magnets during asynchronous start-up. In addition, manufacturers of such generators should provide the number of start-up cycles from cold and warm states in order to avoid shortening the service life of the machine. The main objective of the article is to present the methods of synchronizing a generator of such a design (a rotor with permanent magnets and a starting cage) and their consequences on the behavior of the machine. The presented design allows synchronization of the generator with the network in two ways. The first method enables synchronization of the generator with the power system by asynchronous start-up, i.e., obtaining a starting torque exceeding the braking torque from the magnets. The second method of synchronization is similar to the method used in electromagnetically excited generators, i.e., before connecting, the rotor is accelerated to synchronous speed by means of a water turbine, and then, the machine is connected to the grid by switching on the circuit breaker. This paper presents electromagnetic phenomena occurring in both cases of synchronization and describes the influence of magnet temperature on physical quantities.

EnergiesVol. 18(8)
Wrocław University of Science and Technology (PL), AGH University of Krakow (PL)
Openalex Percentile: Top 94%
Electric Motor Design and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.