Optimizing the Marine Transportation Model for a New Deepwater Offshore Platform at Working Area of Andaman II

Abstract According to the Ministry of Energy and Mineral Resources, Indonesia has been facing the declining of oil and gas reserves capacity. In 2016, gas reserves were 144.72 TSCF while in 2020 it was only 62.39 TSCF. Around 60-70% of potential new gas fields have not been explored. Thus, the construction of new offshore platforms is needed to increase national natural gas reserves. The working area of Andaman II was chosen because it has the highest estimated gas reserves of 2,025 MBOE with a depth of 1,291.3 m. Therefore, this study aims to plan the delivery method of offshore platforms that produce minimum total transportation costs by using assignment problem method. The type of new offshore platform in Andaman II is the Tension Leg Platform (TLP) which consists of tension, hull, topside, and riser. The optimization result shows that the delivery method to build the new offshore platform is the hull and topside shipped simultaneously.

Authors

Institutions

Publication Details

Journal
IOP Conference Series Earth and Environmental Science
Published
2025-03-01
DOI
https://doi.org/10.1088/1755-1315/1473/1/012030
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing the Marine Transportation Model for a New Deepwater Offshore Platform at Working Area of Andaman II

C B S Permana, Irwan Tri Yunianto, D V Devintasari, Siti Dwi Lazuardi et al.
IOP Conference Series Earth and Environmental Science
Marine and Offshore Engineering Studies
article

Optimizing the Marine Transportation Model for a New Deepwater Offshore Platform at Working Area of Andaman II

C B S Permana, Irwan Tri Yunianto, D V Devintasari, Siti Dwi Lazuardi, O S Noarista
article en

Abstract

Abstract According to the Ministry of Energy and Mineral Resources, Indonesia has been facing the declining of oil and gas reserves capacity. In 2016, gas reserves were 144.72 TSCF while in 2020 it was only 62.39 TSCF. Around 60-70% of potential new gas fields have not been explored. Thus, the construction of new offshore platforms is needed to increase national natural gas reserves. The working area of Andaman II was chosen because it has the highest estimated gas reserves of 2,025 MBOE with a depth of 1,291.3 m. Therefore, this study aims to plan the delivery method of offshore platforms that produce minimum total transportation costs by using assignment problem method. The type of new offshore platform in Andaman II is the Tension Leg Platform (TLP) which consists of tension, hull, topside, and riser. The optimization result shows that the delivery method to build the new offshore platform is the hull and topside shipped simultaneously.

IOP Conference Series Earth and Environmental ScienceVol. 1473(1)
United States Department of Transportation (US)
Openalex Percentile: Top 79%
Marine and Offshore Engineering Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.